README web version of /home/usg/OPS/MTS/readme_xml/readme_77035701
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
The aim of the programme is the spectroscopic identification of z~4 (g
dropout) and z~5 (r dropout) LBGs in one of the deep field of the CFHT Legacy Survey.
The high z LBG candidates have been identified in the CFHTLS D4 field using colour
selection criteria, together with population synthesis models, and applying size
and magnitude constraints. The VIMOS pre-imaging data enable a detection of only
the brigther g dropouts.
The current OBs concern the four CFHTLS D4 fields for which VIMOS pre-imaging has
been obtained out of the
requested seven CFHTLS D4 fields. For the remaining three fields, MOS OBs will be
done when their pre-imaging data will become available. Therefore, the execution
time mention below is 4/7 of the allocated
VIMOS-MOS time (i.e. roughly 36.0 hr).
Waiver Requests
Critical Observing Condition Constraints
good seeing (<0.8"), as requested in the proposal to be able to detect
compact g and r dropouts down to AB magnitues of 25, togeter with clear sky and
airmass smaller than 1.2 and lunar illumination samller than 0.4
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you specify suitable guide stars for all your OBs using Guidecam
?
Did you check that the chosen guide stars are suitable for all the offset
positions and that they do not produce unacceptable vignetting of the field of view
?
Last creation of page: Tue Oct 6 15:40:12 2009
If you have comments, please contact usd-help@eso.org