README web version of /home/usg/OPS/MTS/readme_xml/readme_77020700
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
The programme is designed to image 8 fields in the G305 star forming complex.
Six of these are to be observed in JHK broadband plus H2 and BrGamma narrowband
filters, while the final two are to be imaged in JHK broadband filters only. Each
field has been assigned one of 3 priority bands, with band 1 being the most important.
The observations are designed to be analysed before a 6*0.5n follow up ISAAC spectroscopy
run from the 26th June 2006 - 2nd July to enable target selection. Note that the
image centre is indicated by the intersection of the two lines on the finder.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
These observations are designed to be analysed prior to an ISAAC run between
26th June to 6th July to enable target selection. Therefore, if possible we request
these observations to be made in advance of this period - as indicated in the individual
OBs. However, we would still request the program to be completed after this date
as the data in themselves are still essential to the overal science goals of our
programme
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Last creation of page: Tue Oct 6 15:40:12 2009
If you have comments, please contact usd-help@eso.org