README web version of /home/usg/OPS/MTS/readme_xml/readme_77018400
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Our VIMOS IFU observations aim at studying four mergers (and specifically
the nuclei and young star cluster complexes)
in different evolutionary stages - in order of advanced merger stage: NGC 4038/39,
NGC 7764, NGC 3509, NGC 3256.
We plan 2 pointings on each of the galaxies; with 3h integration per pointing (split
into 3 OBs).
The obsvertions are carried out in a single grism: HR_blue, with the 27"x27" FoV
(0.67" spaxels)
We need the 5 Lick standards to be observed. They are bright (V=6 mag) and can be
observed near twilight.
Finding charts are shared by the OB of one galaxy with all poitings indicated (note
that for NGC4038/4039 the IFU FoV should have PA=0 as for all otehr galaxies, i.e.
not as indicated on the finding chart; although strictly speaking the PA does not
matter too much).
No finding charts were given for the Lick std, but all were checked on the DSS and
none has any companion that could make the case ambiguous.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you specify suitable guide stars for all your OBs using Guidecam
?
Did you check that the chosen guide stars are suitable for all the offset
positions and that they do not produce unacceptable vignetting of the field of view
?
Last creation of page: Tue Oct 6 15:40:12 2009
If you have comments, please contact usd-help@eso.org