README web version of /home/usg/OPS/MTS/readme_xml/readme_76505704
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This observing run is devoted (1.5h) to the polarimetric investigation
of the NEO 2004 VD17
We need high signal to noise exposures in order to reach the desired precision in
the evaluation of the object polarization. Polarization is evaluated repeating 3
times the exposure at 4 rotator angle position (0, 22.5, 45, 67.5 deg). As the target
is a fast moving object,
we divided the full scientific observation into 2 separate obx: a first one (mov_2004vd17_dates_A,
shortly run_A) to acquire images at two rotator angles (0 and 45 deg), and a second
one (mov_2004vd17_dates_B [run_B]) to acquire images at rotator angles = 22.5 and
67.5 degrees.
This splitting in 2 obx of the total observing time is needed to check the position
of the target ( a fast moving object) after the first part of the observations and
eventually re-center it, IN THE SAME POSITION OF THE CCD, inside the mask.
WE put the ephemeris selected from one of the nigth of the short observing run proposed,
of course they (and the differential tracking, first column of the sky motion is
the RA motion, second column the DEc. motion) must be changed.
We attach a finder chart as an example, as the obj moves fast. On time asteroid
finder charts could be retrived on line at the web: http://asteroid.lowell.edu/cgi-bin/koehn/astfinder
(insert the observatory (Paranal, N. 309) the date of obs. and the name of the obj
: 2004 VD17), or finder charts with the sky star bacground culd be retrive with
the ESO DSS.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
These observations (run E) must be run between 28-31 may 06 (this run,
together with run F, has been moved after run I as the observations initially proposed
for april were not performed due to bad weather conditions/visitor mode)
in order to evaluate the polarization of 2004 VD17 in the phase angle range 73-80
degrees. In our project we ask for 7 distinct observations in polarimetric mode
to cover 7 different targets phase angle aspects. This observations must be repeated
with a preferential time step of 3-5 days (excluded the periods of full moon or
when the target is too close to the moon).
PLEASE NOTE THAT IN CASE OF PROBLEMS (WEATHER or other things), if
these observations cannot be performed in the indicated dates, they
can be shifted in the following days (4-7 june, as during 1-3 june it is too close
to the moon, during the run F period, getting
so in this run two observations (the delay run_E one and the foreseen run_F) , with
a MINIMUM time separation between the 2 observations of about 24 hours
Special Execution Requirements
Run_B (mov_2004vd17_dates_B, rotator position angle=22.5 and 67.5 deg)
must be performed immediately after run_A (mov_2004vd17_dates_A, rotator position
angle= 0 and 45 deg) ; as the pointing is the same, please do not preset the telescope.
Special Calibration Information
WE need a not polarized std star as calibrator of the instrumental poalrization,
to be observed nearby the asteroid investigation.
We propose here star WD1344+106 (please verify according to the nigth condition
the exp time in order to have a high S/N ratio but not saturation), but any star
taken from the ESO list of not pol stars ("closest" as possible to the target) is
good for our purpose
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:11 2009
If you have comments, please contact usd-help@eso.org