General Description
This is a DDT/ToO proposal that aims at detecting the possible emergence
of a Supernova from the afterglow of GRB060117. It is composed by two parts:
A) BVRI imaging. This should be carried over on a daily basis. According to the
results of the first observations we may want to change the observing frequency
in the next days . We will instruct the night astronomer properly as soon as we
analized the data.
For the time being we submit just the first OB. The next ones will be supplied in
due time.
B) Low res. spectroscopy. This part will be triggered only if we have a positive
SN detection.
In that case, a spectrum will be obtained around Jan 31/Feb 01. Proper instructions
will be given in due time.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
The observations are indeed time critical.
First, they need to be executed as soon as possible, since the target is setting
and the SN evolution at these phases is rather fast;
Secondly, due to the target RA and DEC (21:51, -59:58) observations have to be executed
during evening twilight. See special execution requirements for more details.
Special Execution Requirements
It is crucial that the observations are carried out before the end of
evening twilight,
otherwise the target will be too low on the horizon. Ideal starting time is the
end of
nautical twilight (sun elevation <-12 deg).
Here follow the ephemeris computed for LS, Jan 25/01/2006. They include UT,
Sun elevation, target airmass and corresponding telescope elevation:
UT h(sun) airm h(tel)
--------------------------
00:43 -12.2 2.66 22.1
00:48 -13.2 2.73 21.5
00:53 -14.1 2.80 20.9
00:58 -15.0 2.88 20.3
01:03 -15.9 2.95 19.8
01:08 -16.8 3.04 19.2
01:13 -17.7 3.14 18.6
-------------------------
The night astronomer should take into account the telescope pointing overhead, and
try to
be in position sufficiently early to be able to complete the OB before the airmass
is too high.
On the other hand, integration should not start before the end of nautical twilight.
Total exposure time (including readout overheads) is of the order of 10 minutes.
Therefore,
there should be enough time, also in a week from now.
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?