README web version of /home/usg/OPS/MTS/readme_xml/readme_76502700
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This program aimed at obtaining ~5 hours of integration around Halpha
and ~1 hour around 860nm of the runaway black-hole GRO J1655-40, currently in quiescence,
with the goal of performing an abundance analysis. All OB are exactly 1 hour long.
There are 5 OBs for the Halpha region, called DDT_GRO_J1655-40_REDX, where X=1..5,
and one DDT_GRO_J1655-40_VERY_RED for the 860nm region.
The goal of this program is to obtain a spectrum as good as possible, but as soon
as possible too. The target is observable mostly at the end of the night only. We
request that airmass must be smaller or equal to 2. If by any chance two OBs of
the target are executed in a row, or the acquisition time appears to be much less
than 10 minutes, we would like the support astronomer to increase the exposure time
to compensate for it. Thanks!
Thanks also to USD we have been authorized to submit 5+1 (6) corresponding OBs for
a standard star to be observed (total exp. time has been put to 7h). The names are
DDT_HD156098_REDX, where X=1..5 and one DDT_HD156098_VERY_RED. When an observation
of GRO J1655-40 is performed, the corresponding OB of the standard star must also
be preformed (i.e. the same night). The observation of the standard star can be
done during twilight.
The old OB "DDT_HD156098_RED" is dummy and can be deleted.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Given the observability of the object, observations should not be carried
out before January 30.
Since it is a potential target for regular proposal in P78, program must be completed
by March 15, 2006.
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you need secondary guiding, are there suitable objects within 30 arcsec
from your target ?
Last creation of page: Tue Oct 6 15:40:11 2009
If you have comments, please contact usd-help@eso.org