README web version of /home/usg/OPS/MTS/readme_xml/readme_76080102
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Waiver Requests
076.C-0801B & C.01.WAV APPROVEDS
"Finally I received the approval for your waiver request.
What will happen is the following:
Unless there is an A-ranked program which cannot otherwise be completed,
your programs will be executed on the required dates, if observing
conditions are within your constraints."
Critical Observing Condition Constraints
Time-Critical Aspects
Our OBs must be executed at indicated date during the stellar conjunction
night.
Our OBs must also be executed within specific time interval and specific sequence.
Three nigts are possible and we use three sets of OBs in this run as asked by the
ESO User Support Department: "Please, do submit three sets of OBs, tuned to the
different slots where the observations might be possible. That is fine from our
side, and we will cancel the not-used OBs appropriately once the window of
opportunity has passed or the observations carried out successfully."
the last letters of the OBs determine the alternative sub-run a (with a and as)
b (with b and bs)
and d (with d and ds)
The schedule of the sequence is (UT TIME):
Case of the night of 12/23/2005 (night of 22 to 23):
Flexibility of the schedule is about 10-15 min per each OB.
If these 10-15 minutes are run out, stop the OB and start the next.
23 dec 2005 at 3h00UT CAL_spec_LAND98978a (mV:10)
3h20 CAL_S165Ea (mJ:12.2)
3h40 CAL_FS14a (mJ:14.1)
4h00 MOV_2002aw197JHKsa
4h25 CAL_spec_Hyades142a (mV:8.5)
4h45 MOV_2002aw197Jspeca
5h30 MOV_2002aw197HKspeca
6h50 CAL_spec_LAND98978as (mV:10)
7h15 MOV_2002aw197Jspecas
8h00 MOV_2002aw197HKspecas
Case of the night of 01/05/2006 (night of 04 to 05 in UT TIME):
Flexibility of the schedule is about 10-15 min per each OB.
If these 10-15 minutes are run out, stop the OB and start the next.
5 jan 2006 at 3h00UT CAL_S165Eb (mJ:12.2)
3h20 CAL_S842Eb (mJ:11.7)
3h45 CAL_spec_Land98978b (mV:10)
4h05 MOV_2002aw197JHKsb
4h30 MOV_2002aw197Jspecb
5h15 MOV_2002aw197HKspecb
6h10 CAL_spec_Land1021081b (mV:10)
6H30 MOV_2002aw197JHKsbs
6h55 MOV_2002aw197Jspecbs
7h40 MOV_2002aw197HKspecbs
8h35 CAL_spec_Land1021081bs (mV:10)
Case of the night of 02/27/2006 (night of 26 to 27 in UT TIME):
Flexibility of the schedule is about 10-15 min per each OB.
If these 10-15 minutes are run out, stop the OB and start the next.
27 feb 2006 at 0h00UT CAL_spec_Land98978d (mV:10)
0h20 CAL_S165Ed (mJ:12.2)
0h45 CAL_S842Ed (mJ:11.7)
1h05 MOV_2002aw197JHKsd
1h30 MOV_2002aw197Jspecd
2h15 MOV_2002aw197HKspecd
3h10 CAL_spec_Land98978ds (mV:10)
3H30 MOV_2002aw197JHKsds
3h55 MOV_2002aw197HKspecds
4h50 MOV_2002aw197Jspecds
5h35 CAL_spec_Land1021081d (mV:10)
Special Execution Requirements
In case of problem in the completion of this run, preference should be
given to the spectrocopic OBS
(both science and calibration).
For the night of 12/23/2005, make sure do not include the star for AO in the slit
(less than 6" of the target)
All the spectroscopic calibrator were checked (no binaries)
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have PSF reference star OBs, do the names of those OBs begin with
PSF_ ?
If there are Finding Charts attached to your OBs, is the field-of-view
of at least one of these charts 2' x 2' (with clearly labelled field orientation)
?
Have you clearly marked and labelled your wavefront reference objects
R1, R2, R3, ... (as specified in the NAOS Preparation Software) on your Finding
Charts ?
Have you specified the magnitude of the brightest object in the field-of-view
for each OB ?
Are there objects in any of your fields (including standard stars) which
are brighter than the limits specified in the User Manual and on NACO web Pages
?
If the previous answer is yes, have you given a list of OBs and a justification
for the brightness limit violation in the general description field ?
Last creation of page: Tue Oct 6 15:40:11 2009
If you have comments, please contact usd-help@eso.org