README web version of /home/usg/OPS/MTS/readme_xml/readme_76076900
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
LMC X-1 nebula, four pointings with 27" IFU field.
We supply 4 finding charts manufactured with Skycat/DSS.
Each finding chart is 6' in size, one of the limited options
(0.1 deg) supplied by Skycat, and shows the IFU field of
view. The finding chart is named according to its position.
For each pointing, I need three images so as to remove
cosmic rays. I have not dithered the field of view since
the pointing is quite tight. I guess a small amount would
be ok but I have not requested it.
The total execution time is equal to what I was granted.
Waiver Requests
A waiver was requested on 10 Aug 2005,
and was granted on 11 Aug 2005.
I can reduce the total execution time to
5.0 hours if I allow the OBs to go to 1:16.
If I try to reduce the OBs to 1:00, then I
need 8 OBs rather than 4 OBs, and the overheads
lead to a total observing programme of 7.0 hours.
On this basis, the waiver was granted by
Martino Romaniello of the User Support Dept.
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you specify suitable guide stars for all your OBs using Guidecam
?
Did you check that the chosen guide stars are suitable for all the offset
positions and that they do not produce unacceptable vignetting of the field of view
?
Last creation of page: Tue Oct 6 15:40:11 2009
If you have comments, please contact usd-help@eso.org