README web version of /home/usg/OPS/MTS/readme_xml/readme_76070203
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This is a pre-imaging run for the 076.B-0702(B) run, where we planto obtain
near infrared spectra of the Calcium triplet of red giant branch stars in the Fornax
dwarf galaxy. This observing run was added to the program afer Mario von den Ancker
discovered that we mixed science observations and pre-imaging observations into
one run.
This run description was prepared by Daniel Harbeck (dharbeck@noao.edu) since A.
Kayser. Please cc furhter inqueries also to Daniel Harbeck, as andrea Kayser might
have limited access to email during the week of this Phase II resubmission.
Please feel free to lower the contraint set if the current constaints appear to
tight for a pre-imaging run.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS2 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:11 2009
If you have comments, please contact usd-help@eso.org