README web version of /home/usg/OPS/MTS/readme_xml/readme_76038303
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This program is a ToO which deals with very faint and variable IR
sources. The main aim is to study the spectral continuum of two
sources of this class during their IR brigthening which follows the
X-ray/Gamma-ray activity. Run D is activated only in the case of
positive detection of IR variability during run A or B (photometry).
Each trigger (total execution time of 2hr) is made up by 2 target
OBs. We submitted 22 OBs for a total execution time of about 22hr (2hr
x 11 sources). At the moment of the trigger activation we will specify
the OB name to be executed.
Note that for about half of the target list the IR counterpart
(target) is not known (however we rely upon an X-ray accuracy of
better than 0.6"). For these sources we provide a dummy OBs. In these
cases, at the moment of the ToO activation, we will provide all the
relevant information based on the run A results (position, updated
finding chart, rotator angle, etc.)
Bright Sources
--------------
OBs IR magnitudes
within S27
--------------------------------------------
ToO_1E1048* H > 12
ToO_1E1841* K = 10 Ref1
ToO_AXJ1844* K = 12
ToO_CXCJ0110* K ~ 13
ToO_RXSJ1708* K = 11 Ref1
ToO_SGR0526* K ~ 10
ToO_SGR1627* K > 12
ToO_SGR1900* H = 7 Ref1
ToO_SGR1806* K = 12
ToO_XTEJ1810* K > 12
--------------------------------------------
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have PSF reference star OBs, do the names of those OBs begin with
PSF_ ?
If there are Finding Charts attached to your OBs, is the field-of-view
of at least one of these charts 2' x 2' (with clearly labelled field orientation)
?
Have you clearly marked and labelled your wavefront reference objects
R1, R2, R3, ... (as specified in the NAOS Preparation Software) on your Finding
Charts ?
Have you specified the magnitude of the brightest object in the field-of-view
for each OB ?
Are there objects in any of your fields (including standard stars) which
are brighter than the limits specified in the User Manual and on NACO web Pages
?
If the previous answer is yes, have you given a list of OBs and a justification
for the brightness limit violation in the general description field ?
Last creation of page: Tue Oct 6 15:40:10 2009
If you have comments, please contact usd-help@eso.org