README web version of /home/usg/OPS/MTS/readme_xml/readme_76038301
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This Program is a ToO which deals with very faint and variable IR
sources. The main aim is to study the IR variability followed by
X-ray/G-ray activity. The Program is composed of 4 Runs (A and B: imaging,
C: polarimetry, D: spectroscopy): C and D will only be triggered in
the event that a source from A turns out to be sufficiently
bright.
OBs corresponding to 11 sources (10 known, 1 unknown) have been
submitted. Up to 2 sources could be triggered during the Period.
Each trigger is made up of 3 epochs (in order to follow the source
decay behavior). Each epoch has 1 OB.
The OB for the first epoch should be carried out as soon as possible
after the trigger, followed by a second pointing to be decided once
the first epoch files will be checked.
We submitted OBs for a total execution time of about 16.5hr (1.5hr x 11
sources).
We request to make available the relevant scientific and calibration files
as soon as possible through the ftp server at Paranal.
Bright Sources
--------------
OBs IR magnitudes
within S27
--------------------------------------------
ToO_1E1048* H > 12
ToO_1E1841* K = 10 Ref1
ToO_AXJ1844* K = 12
ToO_CXCJ0110* K ~ 13
ToO_RXSJ1708* K = 11 Ref1
ToO_SGR0526* K ~ 10
ToO_SGR1627* K > 12
ToO_SGR1900* H = 7 Ref1
ToO_SGR1806* K = 12
ToO_XTEJ1810* K > 12
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have PSF reference star OBs, do the names of those OBs begin with
PSF_ ?
If there are Finding Charts attached to your OBs, is the field-of-view
of at least one of these charts 2' x 2' (with clearly labelled field orientation)
?
Have you clearly marked and labelled your wavefront reference objects
R1, R2, R3, ... (as specified in the NAOS Preparation Software) on your Finding
Charts ?
Have you specified the magnitude of the brightest object in the field-of-view
for each OB ?
Are there objects in any of your fields (including standard stars) which
are brighter than the limits specified in the User Manual and on NACO web Pages
?
If the previous answer is yes, have you given a list of OBs and a justification
for the brightness limit violation in the general description field ?
Last creation of page: Tue Oct 6 15:40:10 2009
If you have comments, please contact usd-help@eso.org