README web version of /home/usg/OPS/MTS/readme_xml/readme_76034100
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This project is aimed to obtain deep V and I photometry of a newly discovered
stellar system (Bo A) in the background of the globular cluster 47 Tucanae, most
probably a star cluster belonging to the Small Magellanic Cloud (see Bellazzini,
Pancino & Ferraro, A&A, 435, 871,
a small and deep image of the object can be found in the paper).
The apparent diameter of this cluster of faint stars is ~30 arcsec. The coordinates
attached to the OBs have been computed to place the center of Chip #45 of the SUSI
camera (see finding chart). Two OBs with priority 1 takes series of 5 X 600s images
in V and in I, the other two OBs (priority 2) add 3 X 600s V and I exposures.
Since all the OBs refers to (exactely) the same field, the attached finding chart
is the same for all OBs
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Last creation of page: Tue Oct 6 15:40:10 2009
If you have comments, please contact usd-help@eso.org