README web version of /home/usg/OPS/MTS/readme_xml/readme_76029702
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This is an imaging run with a wide dither pattern to obtain a good superflat.
The goal are final deep R and V images created by the coaddition of the single frames,
which are then used for the search for gravitational arc(lets). As such faint lensing
features are strongly affected by bad seeing conditions as well as a bright moon
we need good seeing condidtions (<=1 arcsec) and a dark moon.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
As we use DARK frames in our data reduction pipeline for creating bad
pixel maps we submitted 5 correspondent calibration DARK-OB's. If it is possible,
please execute them in a way that our observing time is not affected, otherwise
you can skip them. Of course, there's no need to execute them at the same day as
the observations, but within period 76.
Thank you very much :-)!
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Last creation of page: Tue Oct 6 15:40:09 2009
If you have comments, please contact usd-help@eso.org