README web version of /home/usg/OPS/MTS/readme_xml/readme_76029301
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This is a standard VIMOS MOS run. Targets are ultra-compact dwarf galaxy
candidates in the Hydra and
Centaurus clusters. The run consists of 5 pointings (2 in Hydra, 3 in Centaurus)
with one mask for each pointing, i.e. 5 different masks for each quadrant. Each
pointing has 2 identical OBs (e.g. hyd_f1-0 and hyd_f1-1), i.e. a total of 10 science
OBs (4 Hydra, 6 Centaurus), each one with night-time arc template included. Priorities
are higher for *-0 OBs. OBs are longer than 1 hour, a waiver request had been granted.
There will be 10 Lick-standard OBs for calibration.
WE ASK THOSE TO BE TAKEN DURING TWILIGHT!
See 2nd waiver request and special calib information for more details.
The Hydra pre-images arrived earlier, since Hydra has 2 hours lower RA. Therefore,
Hydra OBs are submitted before the Centaurus OBs.
Submission of the 10 Lick standard OBs will be completed beginning of February.
Waiver Requests
There were 2 approved waivers.
1. 076.B-0293B.01.WAV: This was a waiver for > 1 hour OBs, which was approved.
OBs finally will have 1:36 hr execution time.
2. 076.B-0293B.02.WAV: We asked for and got granted 3.6 hours of additional twilight
time to take 10 Lick standards. That is, total execution time of our program becomes
19.6 hours: 16 hours science + 3.6 hours special calib. PLEASE TAKE THE LICK STANDARD
OBs IN TWILIGHT!
Reason for asking for additional time: originally we had asked for visitor mode
and wanted to take standards in twilight. When granted service mode time, this effectively
reduced a lot the time available for standards, which is why we asked for the exception
to take Licks in twilight, in addition to the OPC approved execution time.
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
I have assigned different priorities to the OBs:
For each field, the OB ending with "-0" has higher priority than that ending with
"-1".
That is: preference is spatial coverage, not depth.
If RA pressure (e.g. from COSMOS) does not allow complete execution of our programme,
it would be great if the first OB for each of the five fields is observed.
Special Calibration Information
In total, 10 Lick standards shall be observed, see waiver requests.
WE ASK THOSE TO BE TAKEN DURING TWILIGHT, PLEASE!
The 10 Licks OBs will all have been submitted by beginning of February.
Note that there are two Licks which form a double star system:
HD 131976 and HD 131977. Finding charts have been attached to the corresponding
two OBs.
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you specify suitable guide stars for all your OBs using Guidecam
?
Did you check that the chosen guide stars are suitable for all the offset
positions and that they do not produce unacceptable vignetting of the field of view
?