README web version of /home/usg/OPS/MTS/readme_xml/readme_76024200
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This programme is to obtain V,I photometry of several fields within and
in the surroundings of the
newly discovered Canis Major dwarf galaxy. Since the structure covers several deg
in the sky you
can't recognise any overdensity by inspecting a WFI image and/or the associated
finding charts.
The FCEN series of OBs is to achieve a mosaic of four WFI pointings: one of the
OBs must be executed under PHOTOMETRIC conditions, CLEAR conditions are sufficient
for the other three. The same is true for the FWARP series of OBs. The FC_CEN and
FC_WARP series are mosaics of 2 WFI pointings: also in this case at least one of
the two OBs of the series must be executed under PHOTOMETRIC conditions.
The F-XMM series of OBs is again a 4WFI pointings mosaic (in B,V) but CLEAR conditions
are acceptable for all the OBs since we have already calibrated photometry in this
field.
The typical scheme of these OBs is: 2 X 600s V, 2 X 600s I, 1 X 60s V, 1 X 60s I
exposures.
The dither mode is STARE for all the observations, i.e. no dither at all.
All the other OBs are aimed at obtaining V,I (or B,V) photometry of single WFI fields,
with different exposure times. All of them require PHOTOMETRIC conditions.
Waiver Requests
Critical Observing Condition Constraints
It is absolutely crucial that one of the four OBs of the series FCEN (FCEN-1,
FCEN-2, FCEN-3, FCEN-4)
is executed under PHOTOMETRIC conditions, to achieve the photometric calibration
of the whole 1 deg^2 mosaic that is to be obtained with the four OBs. The same is
true for the FWARP series (of four OBs)
and the (F239.775m07.775, F239.775m07.925, F240.225m07.775, F240.225m07.925) series
and for the FC_CEN and FC_WARP series (of two OBs). We have indicated one of the
OB of each series as the one to be executed under photometric conditions but, obviously
any of the four (two) would serve equally well to the same purpose.
All the other OBs must be executed under PHOTOMETRIC conditions.
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you set 'New Preset' flag in all acquisition templates to 'True'?
Have all your submitted OBs the same filter for the acquisition template
and for the first science template?
Did you combine calibration templates with science templates for any
OB?
Did you combine imaging and spectroscopic templates for any OB?
Did you submit any Focus template?
Last creation of page: Tue Oct 6 15:40:09 2009
If you have comments, please contact usd-help@eso.org