README web version of /home/usg/OPS/MTS/readme_xml/readme_76018800
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
The goal of this run is to determine the accurate orbital period of a
cataclysmic binary, V1040 Cen. We use radial velocity curves of H_beta and other
Balmer lines. The orbital period is roughly estimated to be 1.5 hours. We prepare
5 OBs for this goal (V1040CenBLMD). Each OB has same configurations of equipment
and covers ~53% of an orbital cycle. We don't require continuous runs for these
5 OBs. In order to accurately determine the orbital period, a longer baseline of
the observations is more preferable. We prefer to perform these 5 OBs for several
months rather than continuous 2-3 nights. The other 2 OBs are for low-resolution
spectroscopy; one is for the target (V1040CenREMD) and the other is for its spectrophotometric
standard star (CAL_LTT4816REMD). These 2 OBs should, hence, be taken at the same
night.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
There are 2 OBs which are for low-resolution spectroscopy; one is for
the target (V1040CenREMD) and the other is for its spectrophotometric standard star
(CAL_LTT4816REMD). These 2 OBs should, hence, be taken at the same night.
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Last creation of page: Tue Oct 6 15:40:09 2009
If you have comments, please contact usd-help@eso.org