README web version of /home/usg/OPS/MTS/readme_xml/readme_76017800
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
The purpose of the project is to follow the spectropolarimetric observation
of SNe, typically during the first 2-4 weeks after discovery. For exceptionally
bright and nearby SNe possibly also longer.
The required accuracy is 0.1% in the degree of the polarization.
All OBs come in 2 flavors: with and without order-sorting filter. In the activating
message, we will inform Paranal which ones to use.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
The observations do not need to be coordinated with other observatories.
The first observation of each SN should be obtained as soon as possible. Within
1 or 2 days thereafter, we can inform Paranal whether more observations of the same
SN are desirable. Normally, this gives a lead time of 1-5 days for the next observation.
Similar for any observations at still later epochs.
Special Execution Requirements
Special Calibration Information
We understand that the calibration plan foresees observation of polarized
and unpolarized standards. Therefore, we do not request dedicated observations
of this kind.
However, we are asking to observe within 2-3 days of each SN observation a spectrophotometric
standard. Please note that it will be sufficient to observe this standard at just
one PA of the Wollaston.
We submit OBs for daytime calibrations. But if our colleagues on Paranal judge
the default daytime calibrations as superior, we will gladly benefit from them.
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:09 2009
If you have comments, please contact usd-help@eso.org