README web version of /home/usg/OPS/MTS/readme_xml/readme_76016000
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Waiver Requests
Critical Observing Condition Constraints
The GS provided has R~11.5 which might be too bright for a good seeing.
There's
one potential guide star defined in the configuration file which can be used
(R~13.4). If the use of this potential guide star is needed, the position of
the guide probe can be set to any of the possible positions (NEG or POS)
Time-Critical Aspects
Special Execution Requirements
There 4 OBs for the Group C1 and Group C2 targets. Please *try* to not
execute
more than one OB per night. This requirement can be violated in extreme cases
like: ending of the P76 and the night astronomer needs to execute more than 1 OB
in order to finish the program.
Also: do not execute a new GroupC before the other has finished
The OBs have different priorities:
GroupC1 - 1 (highest)
GroupC2, GroupB, GroupA - 2
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you specify in your OBs the hour angle range for which your Target
Setup files are valid ?
Did you specify in your OBs the magnitudes of FACBs and Guide Star for
all your fields ?
Are the FACBs and Guide Star in the brightness ranges specified in the
FLAMES manual ?
Did you enter the expected signal to noise in your OBs ?
Last creation of page: Tue Oct 6 15:40:09 2009
If you have comments, please contact usd-help@eso.org