README web version of /home/usg/OPS/MTS/readme_xml/readme_75081800
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
as in all previous runs;
standard star is only a suggestion, any other from the list is equally suited
the OB execution time comes out to be 175minutes; I am sure, however, that this
is due to unnecessary overheads, such as having to add an acquisition template when
going from N-imaging to Q-imaging; in fact if I would add the Q-band stuff just
as an extra column, then the observing time including calibration comes out to be
127 minutes. Unfortunately the OBs then do not pass the syntax checks.
spectroscopy should have priority
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Last creation of page: Tue Oct 6 15:40:08 2009
If you have comments, please contact usd-help@eso.org