README web version of /home/usg/OPS/MTS/readme_xml/readme_75070601
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
All pre-images will eventually be used to design mxu masks however only
2 of the fields will be observed spectroscopically this semester, therefore these
fields MUST BE OBSERVED FIRST. The 4 most important OBs are PRE_J1054-1245a, PRE_j1054-1245B,
PRE_J1040-1155a, PRE_J1040-1155b. I have prioritised these above the rest of the
imaging in P2PP.
As a consequence of moving the pre-imaging from run 0706(A) into 0706(B), as requested,
the only phase II left to do within that run is for the mxu spectroscopy. As these
OBs can not be finalised until the pre-imaging from 0706(B) has been received, phase
II for run 0706(A) has not been submitted.
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS2 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:08 2009
If you have comments, please contact usd-help@eso.org