README web version of /home/usg/OPS/MTS/readme_xml/readme_75070200
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
We propose to acquire follow-up high S/N (>250) FEROS spectra of two
bright (V=5.4-6.5) early type SB2 binaries. The aim is to constrain the period and
derived the orbital parameters. To do so, we need to reach a sufficiant phase coverage.
One of the critical points of this program is that the two periods are still ill
constrained.
HD152234 (V=5.2) has a probable period of 126 days, but aliases at 55 and 27 days
are possible alternative.
HD152233 has a period larger than a few tens of days. Probable periods are 42 and
260 days.
We thus require about 25 spectra spread over the entire P75. These should typically
be separated by 6 days in order to probe the different probable periods. No scientific
gain could be reached if the time separation between two obtained spectra is too
small. The absolute minimal separation is 4 days (see more details in the Time-Critical
Aspects)
The S/N is another crucial aspect as the brightness ratio between the binary component
is larger than 10. S/N > 250 is thus critical to unambiguously disentangle the
component spectrum.
A re-evaluation of the schedule at mid-course would allow to optimize the allocated
observing time (see Time Critical Aspects)
Waiver Requests
Critical Observing Condition Constraints
Sources are bright, program can be performed in about all seeing and coverage
conditions.
S/N >250 is a critical aspect.
Targets can be observed during twillight .
Exposure times computed for thin cirrus coverage and seeing below 2 or 3". If the
program is adopted as a backup program in the case of bad weather conditions (thick
cirrus, awfull seeing, large airmass) which prevent other observations, please increase
the exposure time accordingly. Summing up several successive exposures to achieve
the requested S/N is also an alternative.
In any case, whatever the observing conditions, we will get science from our spectra
if the requested S/N > 250 is reached.
Time-Critical Aspects
Because of the target periods (see General Description), we required about
22 follow-up spectra spread over the entire P75. These should be typically separated
by 6 days in order to probe the different probable periods. No scientific gain is
reached if the time separation between two obtained spectra is too small. The absolute
minimal separation is 4 days.
According to the Service Mode allocated time on FEROS, we propose the following
schedule for our observations (+-2nights):
Apr17, Apr26,
May 1, May 6, May 11, May 15, May 28,
Jun 2, Jun8, Jun 14, Jun 26
Jul 1, Jul 7, Jul 13,
Aug 14, Aug 20, Aug 26
Sept 1, Sept 8, sept 14
Sept 25, Sept 30
(to be performed untill the 22 allowed spectrum have been acquired)
However, any other schedule yielding 22 spectra of each target spread over P75 and
separated from the previous obtained spectra by typically 6 days is acceptable.
Because of the still uncertain period, it would be particularly relevant to carry
out an re-evaluation of the proposed schedule at mid-course in P75, especially to
optimize the last SM large allocated period (Aug14-Sept15) according to the new
contraints on the period that will be derived from the first set of observations.
For this reason it would be of the greatest interest if we could get an acces to
the data that will be obtained prior to Jul 14.
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you set 'New Preset' flag in all acquisition templates to 'True'?
If you use any lamp, did you check that it should never be left on at
the end of any OB?
Last creation of page: Tue Oct 6 15:40:08 2009
If you have comments, please contact usd-help@eso.org