README web version of /home/usg/OPS/MTS/readme_xml/readme_75069500
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This is a very straightforward VIMOS-IFU program aimed to
measure the stellar velocity field of
a Low Surface Brightness galaxy.
We plan to take 2 groups of 4 exposures each.
Every exposure is about 30 min.
The first group of exposures (pointing A) is centered in the NE side of the galaxy,
11 arcsec from the galaxy center, along the galaxy major axis (position angle 40
deg)
The second group of exposures (pointing B) is centered in the SW side of the galaxy,
11 arcec from the galaxy center, along the galaxy major axis (position angle 40
deg)
These two different pointing have been identified in the finding chart by the labels
pointing A and pointing B respectively.
The entire run is divided onto 8 OBs of 1 hour (30 min of exposure time + 30 min
of overheads)
The PI had requested an extension of one week in the deadline for the
delivery of the Phase 2 material. This was granted as communicated with
an email message from F.Comeron of 22.2.05.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you specify suitable guide stars for all your OBs using Guidecam
?
Did you check that the chosen guide stars are suitable for all the offset
positions and that they do not produce unacceptable vignetting of the field of view
?
Last creation of page: Tue Oct 6 15:40:08 2009
If you have comments, please contact usd-help@eso.org