README web version of /home/usg/OPS/MTS/readme_xml/readme_75064901
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Our programme consists of 4 VIMOS fields in a ~ 30' x 30' region around
a z=0.8 galaxy cluster.
An overall finding chart showing these 4 fields can be found at
http://www.mpe.mpg.de/~milvang/tmp/cl1216_VIMOS_footprints3.ps.gz
For each field we have 4 identical OBs each doing 1 hour 7.5 min of integration
(split in
5 x 13.5 min), giving a total exposure time of 4.5 hour per field. Each OB has an
execution
time of 1 hour 43.5 min, for which we have a phase 2 waiver.
Our targets have total I-band magnitude in the range 19-22. In each quadrant we
have 2-3
reference "slits" (4" x 4" boxes) with stars that were bright but unsaturated in
our
100 sec R-band pre-images. In each OB we give the exact number of reference slits
to look for.
We take 5 exposures (of 13.5 min) at offset positions -1.6 +1.6 -0.8 +0.8 0 arcsec,
where 0 is the preset position, to be able to correct for fringing.
The OBs should be observed within 2 hours of culmination. This corresponds to an
airmass below 1.17, but we had to enter 1.1 in the constraints set, since only 1
decimal was allowed.
We have two night time calibration OBs, called CAL_*_UseThisOne, which each observes
a hot star
(spectral type O or B).
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you specify suitable guide stars for all your OBs using Guidecam
?
Did you check that the chosen guide stars are suitable for all the offset
positions and that they do not produce unacceptable vignetting of the field of view
?
Last creation of page: Tue Oct 6 15:40:08 2009
If you have comments, please contact usd-help@eso.org