README web version of /home/usg/OPS/MTS/readme_xml/readme_75046200
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
The observations must be conducted at the following time spans:
OGLE-113:
observation on Apr 04th from 0:15 to 05:15 UT
AND
observation on Apr 14th from 1:00 to 06:00 UT
OGLE-132:
observation on Apr 20th from 0:30 to 05:30 UT
OGLE-56:
observation on June 15th from 1:45 to 04:45 UT (stop before zenith crossing)
AND
observation on July 02nd from 2:15 to 03:45 UT (stop before zenith crossing)
AND
observation on July 02nd from 4:15 to 05:45 UT (start after zenith crossing)
AND
observation on July 06th from 23:00 to July 7th 02:30 UT (please start as early
as possible after twilight)
Note 1 (obvious, but may help): the dates are in UT (also in the OB name), after
0:00. A date D usually corresponds to a night starting at D-1.
Special Execution Requirements
Acquisition: the star should be put next to the pixel given in the acq
template (not very precisely), because it seems to be a clean piece of the detector.
Execution: Please have a check for saturation on the target, if the seeing is very
good.
Target coordinates:
OGLE-113 RA_2000=10:52:24.40 DEC_2000=-61:26:48.5
OGLE-132 RA_2000=10:50:34.72 DEC_2000=-61:57:25.9
OGLE-56 RA_2000=17:56:35.51 DEC_2000=-29:32:21.2
Execution sequence: for each observing dates ("Time-critical aspects") there are
several OBs to be executed consecutively (because P2PP does not allow for more than
100 exposures in a row). Start with number 1 which has Preset Flag TRUE and then
continue with 2 and (sometimes) 3 (no preset, or preset to be skipped in BOB). If
the star drifts on the detector by more than 20 pixels, please redo the acquisition
during the sequence. Otherwise the sequence should not be interrupted (ie choose
a guide star allowing long adaptor times). Crossing of the zenith is avoided in
the time interval definition.
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Last creation of page: Tue Oct 6 15:40:07 2009
If you have comments, please contact usd-help@eso.org