README web version of /home/usg/OPS/MTS/readme_xml/readme_75030600
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Simple deep imaging observations of one QSO field.
Some of the images are to be taken with the B and/or the R filters. The other images
are to be taken with the narrow-band filter FILT_406_5+110. Please check that this
narrow-band filter name is properly set in the OB before starting the OB execution.
The reason for this is that I had to manually edit the .obx files at phase II because
this filter name is not in the list of filters known by P2PP, although this is an
ESO filter.
The execution time has been split into 2h01min and 2h59min for runs A (PHO) and
B (CLR) respectively (instead of 2h30min for each of them). This should not be a
problem though, since less observing time than granted is requested under photometric
conditions.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:07 2009
If you have comments, please contact usd-help@eso.org