README web version of /home/usg/OPS/MTS/readme_xml/readme_75021900
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
The program consists of 13 RR Lyrae variable stars to be observed spectroscopically
in order to measure their radial velocities and metallicities. They are distant
(~40 kpc, V~18-19.8) halo stars.
We wish to obtain a high S/N in the spectral region of the Ca II H and K lines.
All the stars in the program have a large amplitude (~1 mag). Thus, the relative
brightness of the targets shown in the finding charts may be different at the moment
of taking the spectra.
The spectra will be taken at random phases on the pulsation cycle of the stars.
We calculated the exposure times so we can have a decent S/N even if the stars are
observed at minimum light.
The program also contains some radial velocity standard stars.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Our program includes 5 radial velocity standards to be observed during
the run. Since our observations will likely span for several nights, we will prefer
to have only one standard observed in a night when our science targets are observed
too. Thus, the 5 standards should be observed in 5 different nights.
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS2 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:07 2009
If you have comments, please contact usd-help@eso.org