README web version of /home/usg/OPS/MTS/readme_xml/readme_75020200
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
The aim of the project is to detect planets orbiting young stars by
means of precise radial-velocity measurements using the
ThAr-simultaneous reference method. The observations are thus similar to
other planet search programs on HARPS. There are 5 to 8 OBs per star for
taking 5 to 8 spectra of each star in this semester. There are more OBs
for those stars that are observable most of this semester. The main
purpose is to detect planets of relatively short periods that is, down
to periods of three days. Thus, ANY spacing of the observations of the
same star is fine, even consecutive nights, as long as the separation
between the first and the last spectrum of this star is about a month
(or larger). I put in the user priorty for each target. A 1 means high
priority, and 10 is the lowest priority. Generally speaking, objects of
low preority have a larg vsini and thus only a low accuracy of the
RV mearurements (e.g. 10-20 m/s) can be achieved.
Waiver Requests
Project 075.C-0202(A) is a direct continuation of 074.C-0037(A). In 074.C-0037(A)
we
observed BE Cet and HD 105. Since these two stars can also be observed in this
semester, and since the RV data from 074.C-0037(A) which I just received shows
cleary RV-avriations, I would like to take 5 additional spectra of these stars
in order to find out, whether these stars have planets or not.
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
Just standard callibartions for high precision RV-measurements are
needed (As discribed in the HARPS manual page 14). That is at the
beginning of the night: 1xbias, Flat fiber A, Flat fiber B, 5xFlat
fiber AB, 2xThAr fiber AB.
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Last creation of page: Tue Oct 6 15:40:07 2009
If you have comments, please contact usd-help@eso.org