README web version of /home/usg/OPS/MTS/readme_xml/readme_75018500
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This is a program to do high resolution spectroscopy of 5 stars that were
found to be transited by giant planets. Four of these are very faint targets (I=14-16),
discovered by the OGLE survey. The last one (TrEs-1) is brighter (V=11.8).
The general scientific goals are:
- Derive precise stellar parameters and chemical abundances for the stars (including
Li)
- Derive a chromospheric activity index based on CaII H and K lines near 3900A
To achieve this goal, we are using:
- Red arm: slit of 0.9'' and bin 2x2 for OGLE candidates and 0.9''/1x1 for TrEs-1;
This should provide us with a R near 50000 for the spectra.
- Blue arm: slit of 1.1'' and bin 2x2 for all targets; This should provide us with
R>40000.
Different priorities were given to the different targets. The goal of
our priority scale is such that we prefer to have one priority 1 object with
all OBs observed before you start observing OBs for a priority 2 object.
Different OBs of the same target are named: *A to *F. No difference exist between
these OBs.
Waiver Requests
Critical Observing Condition Constraints
OGLE candidates: faint targets (I=14-16): dark time is needed. Also, if
choice
is possible, please try to observe under good seeing conditions (the critical
seeing limit has been lowered because the proposal is in priority B).
For TrEs-1, no dark time is needed (V=11). However, this star is observable
at a high air-mass. In this case, please be sure that no thin cirrus exist
IF moon is bright.
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you need secondary guiding, are there suitable objects within 30 arcsec
from your target ?
Last creation of page: Tue Oct 6 15:40:06 2009
If you have comments, please contact usd-help@eso.org