README web version of /home/usg/OPS/MTS/readme_xml/readme_75002302
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This program is a compensation for ToO time given the 2005 Jul 30 UT
from 02:27 UT to 04:17 UT.
The program is aimed at reconstructing accurately the short therm photometric
variability of the Uranian Irregular Satellite Prospero. The most important
target of our program in the evening the ToO occurred.
We plan to use for this FORS2 at UT1. The program shall best be
performed in the second half of September 2005.
The estimated magnitude for Prospero is R~23.5. The magnitude will change barely
of 0.1 mag between August and September and exposure times do not need to be
adapted. This plan would allow to reach a relative accuracy of at most some 0.01mag
The program consists simply of a sequence of exposures obtained keeping
Prospero at the center (within 1 arcmin) of the master CCD camera of FORS2.
The sequence of frames is R B R V R I R ... R, each exposre of 300 secs.
The sequence is accomodated in two OBs named MOV_PROSPERO_SQ0 and
MOV_PROSPERO_SQ1 to be executed in sequence (= one after the other)
The MOV_PROSPERO_SQ0 shall be executed first.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS2 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:06 2009
If you have comments, please contact usd-help@eso.org