README web version of /home/usg/OPS/MTS/readme_xml/readme_75002100
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
The idea of the project is to gather 4 FEROS observations of two rather
bright O-type stars (one has m_V=5.9, the other m_V=8.6) in order to find out whether
they are long-period binary systems and establish their orbital solutions. Therefore,
the observations should ideally be spread over the entire period 75 with a separation
of at least a few weeks between two consecutive observations. I have prepared four
OBs for each target. Following the schedule for service mode runs at the 2.2m telescope,
I have specified consecutive and non-overlaping time windows of 4 - 8 weeks (April
1 - May 20, May 25 - June 20, June 25 - July 31, August 10 - September 30) for these
OBs. Note that both targets need not be observed on the same nights.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
As stated above the observations should be spread over the entire duration
of period 75 with a separation of at least a few weeks between 2 consecutive
pointings.
Therefore, the four OBs have consecutive and non-overlaping time windows of
about 1 - 1.5 month:
9_sgr_obs1 and HD168112_obs1: April 1 - May 20
9_sgr_obs2 and HD168112_obs2: May 25 - June 20
9_sgr_obs3 and HD168112_obs3: June 25 - July 31
9_sgr_obs4 and HD168112_obs4: August 10 - September 30
Note that both targets need not be observed on the same nights.
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you set 'New Preset' flag in all acquisition templates to 'True'?
If you use any lamp, did you check that it should never be left on at
the end of any OB?
Last creation of page: Tue Oct 6 15:40:06 2009
If you have comments, please contact usd-help@eso.org