README web version of /home/usg/OPS/MTS/readme_xml/readme_60941900
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
UBV+VIS+NIR spectroscopy of a V=18.5 star (point source) in the NGC55
galaxy (Sculptor Group).
Aim: SNR > 15 per DIT in all band(except K); SNR total > 35.
Target : NGC55 C1_31 : RA=00:15:00.01 ; DEC=-39:12:41.39
Observing mode : SLIT / ELEV
Instrument Setup: slitwidth=0.8/0.9/0.6 in UVB/VIS/NIR
Exposure time: 6x900sec in total
Offset pattern: 3 AB cycles (900sec in each position) with Nod throw=5" (approx.
I trust the SV-team if another value is recommanded for point
sources) to handle sky subtraction in the NIR
READOUT: 1x1 slow
If needed, please call me any time at :
+31 20 525 8496 (office hours in Europe)
+31 65 222 6383 (any other time)
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
I request 3 AB cycle with 900secDIT at each position. It has been split
as follows :
- 1 OB with 2 AB cycle, duration 1h20
- 1 OB with the 3rd AB cycle, duration 0h45
If possible, please execute the 2 OBs in a row.
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you specified the S/N ratio at given wavelength in the User Comments
field of each OB?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Last creation of page: Tue Oct 6 15:40:06 2009
If you have comments, please contact usd-help@eso.org