README web version of /home/usg/OPS/MTS/readme_xml/readme_60941600
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
-------------------------------------------------------------------
Principal Investigator Email Address : oliveira@strw.leidenuniv.nl
====================================
Estimated Total Execution Time (hours, including overheads) : 1.0 (hours)
===========================================================
General Description
===================
Science case
------------
An intriguing newly discovered object, selected based on IR-excess on
Spitzer photometry, has been observed in the Serpens Molecular
Cloud with the InfraRed Spectrograph (IRS) on board the Spitzer Space
Telescope. The IRS spectrum presents strong high ionization lines
consistent with a supernova remnant (SNR). Although these data give
important clues, it is not possible to confirm the nature of this
source by the IRS spectrum alone. Complimentary high resolution
spectroscopy is necessary to disentangle this puzzle and rule out
other interpretations such as a dusty planetary nebula. Bright
spatially resolved emission lines in a wide range of wavelengths should
provide the necessary information and confirm this object as a
SNR. With X-shooter on the VLT, enough S/N for line detection can be
achieved in 45 minutes. If confirmed, this object will be the 2nd SNR
discovered by its infrared properties.
Technical details
-----------------
Granted time: 1h
Slit: 1"
Orientation: 45 degrees from North to East
Nodding on slit:
- 2 cycles (ABBA sequence)
- 1 UVB, 2 VIS and 3 NIR exposures per position
- integration times 690s in UVB in 1x2 slow, 320s in VIS in 1x2
slow, and 240s in NIR the total execution time splits as follows:
- Pointing / acquisition / SLIT setup: 360s + 180s + 30s = 570s
- At each position the total integration and readout time per arm is:
o UVB: 1x(690+38) = 728s
o VIS: 2x(320+48) = 736s
o NIR: 3x(240+0.88) = 723s
- Total integration and readout time: 4x736s = 2944s
- Total telescope offsets: 4x15 = 60s
- Total execution time: 59m34s
Critical Observing Condition Constraints
========================================
SKY TRANSPARENCY: 2CLR
SEEING: 1.2 (arcsec)
LUNAR ILLUMINATION: 0.7 (0.0-1.0)
MOON ANGULAR DISTANCE: 50 (degrees)
Time-Critical Aspects
=====================
N/A
Special Execution Requirements
==============================
The Object's R magnitude is 22. If it's hard to spot the object in the
acquisition image and the night astronomer prefers to use an offset
from a reference star, then I'm providing a reference star:
Target (marked in red in FC): 18:28:27.12 +00:44:44.25 (J2000.0)
Reference star (marked in green in FC): 18:28:26.22 +00:44:51.2 (J2000.0)
Offset from reference to target: 13.50" East, 7.02" South
Two finding charts are given, with different sizes (as requested in
July when I first sent this information for the run that was canceled).
The object has better airmass during the August run than the September run.
Special Calibration Information
===============================
No extra calibrations needed.
ToO Information
===============
N/A
ToO Activators List
===================
N/A
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you specified the S/N ratio at given wavelength in the User Comments
field of each OB?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Last creation of page: Tue Oct 6 15:40:06 2009
If you have comments, please contact usd-help@eso.org