README web version of /home/usg/OPS/MTS/readme_xml/readme_60940700
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Important: for any communication about this program, please contact Daniele
Malesani (malesani@astro.ku.dk) further to the PI (Massimo Della Valle).
The aim of this proposal is to observe Hbeta from our two targets, both at z=2.38
and close in the sky. The line falls at the observed wavelength lambda = 16440 AA.
The aim is to measure its luminosity, the ultimate goal being to use it as a distance
indicator and build a Hubble diagram independent of the type-Ia SNe.
Since the two targets of the program are very close in the sky (10 arcmin apart)
it may save pointing overheads to observe them one just after the other. The targets
have good visibility during both the August and September runs, although they become
very close to the Moon in the September run, we thus recommend their observation
in August. Indeed, while the main goal is to measure the flux of a line in the H
band (where Moon is not an issue), other useful lines fall in the optical, so a
dark sky, although not mandatory, would be beneficial.
The first target ("B1") is faint and acquisition is carried out through a blind
offset from a nearby star (see finding chart). The second target ("B6") is bright
enough for direct acquisition.
By verifying the OBs, a warning is issued, namely that the UVB and VIS arms may
be undersampled. This is not a major problem, since we are primarily interested
to the NIR arm, and any line possibly detected in the optical region will be likely
intrinsically broad.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Given the Moon and airmass constraints, the target should be observable
on Aug 10-15 (the entire Aug SV run) and Sep 25-26. We express a mild preference
for the August run, since the proximity of the Moon in September will make the UVB
and VIS observations less valuable. Our main goal is however in the NIR.
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you specified the S/N ratio at given wavelength in the User Comments
field of each OB?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Last creation of page: Tue Oct 6 15:40:06 2009
If you have comments, please contact usd-help@eso.org