README web version of /home/usg/OPS/MTS/readme_xml/readme_60940000
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This program is aimed at observing trans-Neptunian objects [Moving Targets].
The ephemeris file was attached, please update RA, DEC and additional velocitites
to the time of observation accordingly.
We are doing nodding on slit with just one cycle (1800 sec x nod position in UBV
and VIS, and 600 x 3 per nod position in NIR).
The estimated SNR is about 30 in VIS assuming standard seeing and clear sky. In
case of bad weather conditions, if possible, please repeat.
We don't need a telluric star but a solar analogue star. We prepared the corresponding
OB. This OB should be executed immediately before or after the observation.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you specified the S/N ratio at given wavelength in the User Comments
field of each OB?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Last creation of page: Tue Oct 6 15:40:06 2009
If you have comments, please contact usd-help@eso.org