README Template 71.1 (please do not delete the README Template Version line!) ESO Programme ID: 071.D-3009(C) Principal Investigator Name: Massimo Della Valle Principal Investigator E-mail Address: massimo@arcetri.astro.it Principal Investigator Telephone Number: +39 055 275214 Principal Investigator Postal Address: Osservatorio Astrofisico di Arcetri, L.go Enrico Fermi N.5, 50125, Firenze, ITALY Contact person: Elena Mason, ESO-Santiago Phone (office): 3103 (or Paranal); (home): +56 2 2456276 email: emason@eso.org Postal Address: Alonso de Cordova 3107, Casilla 19001, Santiago, Chile Instrument: VIMOS OPC Priority Class: B OPC Approved Total Execution Time: 30 hr Estimated Total Execution Time (including overheads): 30 hr README File Submission Date: 5/04/2003 Programme Description ===================== General Overview ---------------- This is the first spectroscopic follow up of SNs candidate (program part C) selected after blinking and analysis of the previous 2 deep imaging frames. SNs candidates are faint thus a total of 4 hr exposure time is required. Spectroscopic set up is LR_red mode with no filter. 4 OBs have been prepared, each taking about 1:10 hr execution time. The OB should be executed in a raw and/or within two consecutive night, similarly to the imaging run. The OB should be executed at the soonest because the SNs target are fading rapidly. Approved Waiver Request Summary ------------------------------- 1) execution of OB longer than 1 hr 2) completion of DIR1 within 2 consecutive nights 3) immediate release of the imaging data according to pre-imaging policy Critical Observing Condition Constraints ---------------------------------------- observability constraints are quite strict as poor sky condition will compromise the spectroscopic follow up. However, we know that seeing constraints are not guaranteed after the first hr of execution time. Time Critical Aspects --------------------- It is important to expose the field for 4 hr (plus overhead) at the soonest due to the "transient" nature of our targets. NOTE (old comment): about scheduling and following spectroscopic run: Finally a short comment on spectroscopic observations. The spectroscopic follow-up has NOT the nature of ToO- We got time to carried out the spectroscopy of the Transients Objects *as soon as possible*, after the II (and III) imaging run-- However since at z~1 the light curve decay of SNe is stretched by (1+z), one can relax the beginning of spectroscopic observations up to 10 days after receiving the mask- Therefore the best option is to observe the II epoch (imaging) at about one week before the new Moon and to carry out spectroscopy *up to* 1 week after the new Moon, i.e. 14 days later. If this should be not possible, spectroscopic observations delayed by 3 weeks after the II epoch are still acceptable. This should still allow the spectroscopic confirmation of those SNe which were rising to maximum light during the I epoch (about 30% of the events that we expect to detect by applying the proper strategy sketched out above, i.e., spectroscopic follow up carried out immediately after the II epoch-imaging). NOTE (new): we are already in the "second option" case, listed above. Special Calibration Information ------------------------------- no special calib requested ToO Information --------------- spectroscopic run is not officially a ToO ... Pre-Imaging Requirements ------------------------ part C of the program is not preimaging OB Information ============== List of Science OBs with Associated Finding Charts -------------------------------------------------- Total Number of Submitted Science OBs (for program part C): Field1_LR_red_1C Field1_LR_red_2C Field1_LR_red_3C Field1_LR_red_4C Total Number of Submitted Finding Charts: 4 one per each VIMOS frame: 71.D-3009C.001.ps --> chip1 71.D-3009C.002.ps --> chip2 71.D-3009C.003.ps --> chip3 71.D-3009C.004.ps --> chip4 List of Calibration OBs with Associated Science OBs --------------------------------------------------- Total Number of Submitted Calibration OBs: 0 OB Compliance Checks ==================== (Y = Yes, N = No, NA = Not Applicable) Do all your OBs comply with the instrument specific requirements listed on the instrument specific Phase 2 Web pages ? [Y/N/NA] na If you submitted OBs for standard stars, did you specify the magnitude and spectral type of all standard stars ? [Y/N/NA] na Have you included OBs for any calibrations that you need but which are not a part of the Calibration Plan? [Y/N/NA] na [FORS only] Do all your FORS OBs use only the allowed detector read-out modes listed on the FORS1/FORS2 Phase 2 Web pages? [Y/N/NA] na [FORS only] Do all your FORS MOS/LSS OBs contain the mandatory "through-slit image" template? [Y/N/NA] na [UVES only] Do all your UVES OBs use only the allowed templates listed on the UVES Phase 2 Web pages ? [Y/N/NA] na [ISAAC only] Are ALL the objects in your field-of-view fainter than the magnitude limits specified on the ISAAC Phase 2 Web page ? [Y/N/NA] na [ISAAC only] If you submitted OBs for standard stars, did you use the provided StandardStar templates? [Y/N/NA] na [FLAMES only] Did you specify the hour angle range for which your Target Setup files are valid ? [Y/N/NA] na [WFI only]Are your finding charts 34 arcmin x 34 arcmin? [Y/N/NA] na If you answered "NO" to any of these questions, please revise your OBs *before* submission.