README Template 71.1 (please do not delete the README Template Version line!) ESO Programme ID: 071.D-3009(B) Principal Investigator Name: Massimo Della Valle Principal Investigator E-mail Address: massimo@arcetri.astro.it Principal Investigator Telephone Number: +39 055 275214 Principal Investigator Postal Address: Osservatorio Astrofisico di Arcetri, L.go Enrico Fermi N.5, 50125, Firenze, ITALY Contact person: Elena Mason, ESO-Santiago Phone (office): 3103 (or Paranal); (home): +56 2 2456276 email: emason@eso.org Postal Address: Alonso de Cordova 3107, Casilla 19001, Santiago, Chile Instrument: VIMOS OPC Priority Class: B OPC Approved Total Execution Time: 30 hr Estimated Total Execution Time (including overheads): 30 hr README File Submission Date: 5/04/2003 Programme Description ===================== General Overview ---------------- This is the second deep imaging run (DIR2, program part B) of a selected field to be performed in V and I band. The idea is to perform a total of 3 deep imaging runs (program part A, B and D) of a same field searching for "high" - mid z supernovae. The 3 runs need to be 30 days (+/-3 days) far apart each other, and need to be executed during dark time. After comparison of 2 consecutive DIR we will trigger a spectroscopic follow up (program part C and E). Each imaging run should be executed within 2 consecutive nights (original request of one single night run has been modified according to the PSO comments: as VIMOS lacks of atmospheric dispersion correction, observations should be performed within +/- 2 hr from meridian crossing.) Submitted OB for DIR2 are 4 (2 for the I and 2 for the V imaging) There is no any particular execution order constraints though alternace of the two filter would be preferred. When executing 2 OB in a row acquistion can be skipped. Waiver request has been sent & approved for OB > 1 hr and run completion within 2 consecutive nights. Observability constraints need to stay valid for the first hr and we acchept possible degradation of the observability constraints during the following hr and/or the next night. Filed center coordinates (J2000): alpha=14:21:50.0 delta=02:51:51 Approved Waiver Request Summary ------------------------------- 1) execution of OB longer than 1 hr 2) completion of DIR1 within 2 consecutive nights 3) immediate release of the imaging data according to pre-imaging policy Critical Observing Condition Constraints ---------------------------------------- max seeing 0.9 dark sky (due to the faintness of the targets) and clear sky conditions airmass =<1.4 [required for the first hour integration] Time Critical Aspects --------------------- It is important to expose each field for 4 hr (plus overhead) every 30 days (with small tolerance +/-3 days, also to guarantee the dark time) It is also important to complete each DIR# withing 2 consecutive nights as frames of a same run have to be coadded (and afterwards compared with combined frames from the following DIR) NOTE about schduling and following spectroscopic run: Finally a short comment on spectroscopic observations. The spectroscopic follow-up has NOT the nature of ToO- We got time to carried out the spectroscopy of the Transients Objects *as soon as possible*, after the II (and III) imaging run-- However since at z~1 the lightcurve decay of SNe is stretched by (1+z), one can relax the beginning of spectroscopic observations up to 10 days after receiving the mask- Therefore the best option is to observe the II epoch (imaging) at about one week before the new Moon and to carry out spectroscopy *up to* 1 week after the new Moon, i.e. 14 days later. If this should be not possible, spectroscopic observations delayed by 3 weeks after the II epoch are still acceptable. This should still allow the spectroscopic confirmation of those SNe which were rising to maximum light during the I epoch (about 30% of the events that we expect to detect by applying the proper strategy sketched out above, i.e., spectroscopic follow up carried out immediately after the II epoch-imaging). Special Calibration Information ------------------------------- no special calib requested ToO Information --------------- deep/pre imaging run (program part A, B, and D) are not a ToO Pre-Imaging Requirements ------------------------ deep imaging runs has been classified as pre-imaging by USG OB Information ============== List of Science OBs with Associated Finding Charts -------------------------------------------------- Total Number of Submitted Science OBs (for program part B): Field1_FiltV_B.1 Field1_FiltV_B.2 Field1_FiltI_B.1 Field1_FiltI_B.2 Total Number of Submitted Finding Charts: 1 071.D-3009B.001.ps finding chart is 18'x18' in size, and reports program ID, PI name, and the OB names associated to it. List of Calibration OBs with Associated Science OBs --------------------------------------------------- Total Number of Submitted Calibration OBs: 0 OB Compliance Checks ==================== (Y = Yes, N = No, NA = Not Applicable) Do all your OBs comply with the instrument specific requirements listed on the instrument specific Phase 2 Web pages ? [Y/N/NA] na If you submitted OBs for standard stars, did you specify the magnitude and spectral type of all standard stars ? [Y/N/NA] na Have you included OBs for any calibrations that you need but which are not a part of the Calibration Plan? [Y/N/NA] na [FORS only] Do all your FORS OBs use only the allowed detector read-out modes listed on the FORS1/FORS2 Phase 2 Web pages? [Y/N/NA] na [FORS only] Do all your FORS MOS/LSS OBs contain the mandatory "through-slit image" template? [Y/N/NA] na [UVES only] Do all your UVES OBs use only the allowed templates listed on the UVES Phase 2 Web pages ? [Y/N/NA] na [ISAAC only] Are ALL the objects in your field-of-view fainter than the magnitude limits specified on the ISAAC Phase 2 Web page ? [Y/N/NA] na [ISAAC only] If you submitted OBs for standard stars, did you use the provided StandardStar templates? [Y/N/NA] na [FLAMES only] Did you specify the hour angle range for which your Target Setup files are valid ? [Y/N/NA] na [WFI only]Are your finding charts 34 arcmin x 34 arcmin? [Y/N/NA] na If you answered "NO" to any of these questions, please revise your OBs *before* submission.