README Template 71.1 (please do not delete the README Template Version line!) ESO Programme ID: 071.D-0387 Principal Investigator Name: William A. Heindl Principal Investigator E-mail Address: wheindl@ucsd.edu Principal Investigator Telephone Number: 858-534-8016 Principal Investigator Postal Address: UCSD/CASS-0424 9500 Gilman Dr. La Jolla, CA 92093, USA Instrument: ISAAC OPC Priority Class: B OPC Approved Total Execution Time: 3.5 Estimated Total Execution Time (including overheads): 3.5 README File Submission Date: 5/3/05 Programme Description ===================== General Overview ---------------- This program consists of four runs: A, B, C, & F. Our goal is to obtain medium resolution IR spectroscopy (Run A) and JHK photometry (Runs B&C) on ten nights spanning the 18.45 day orbital period of the X-ray binary GRS1758-258. This will allow us to measure the radial velocity curve of the companion as well as its ellipsoidal modulations. It is very desirable, but not absolutely required, that both spectroscopy and photometry be performed on the same set of nights. Ideally, the observations will be spaced equally in orbital phase from an arbitrary zero point. Run A is the spectroscopy taken on nine nights. Nine identical OBs are provided. We had to drop one proposed OB in order to stay within our time allocation. Runs B & C are the JHK photometry. B has a single OB requiring photometric conditions. C has the remaining nine OBs, which allow "thin cirrus" observing conditions. Run F is for spectroscopy of three radial velocity standards. It consists of three OBs. This README covers only the OBs for run C. Nine identical OBs are provided, and these are denoted as "seqC - photometry phase-X", where the "X" is a digit, 0-8. Phase range 9 is covered by run B. The following is a list of acceptable dates for these eight OBs. These dates correspond to the dates of phases 0-8 as defined in run A. We reiterate that it is highly desirable that the corresponding OBs from run A be done on the same nights as these OBs, because the spectroscopy (run A) will help in correcting the ellipsoidal variation measurements (run B+C) for contamination from the black hole accretion disk. Note that the GRS1758-258 finder charts labeled .001 are DSS2 IR images which is close to J-band. Zoomed K-band finders are labeled .002, and these will be the most useful for finding the field. Each date corresponds to the beginning date of the observing night. For example, "2003 6 14" means the night of 2003, June 14-15. PHASE 0 2003 4 2 2003 4 20 2003 4 21 2003 5 8 2003 5 9 2003 5 27 2003 5 28 2003 6 14 2003 6 15 2003 7 3 2003 7 4 2003 7 21 2003 7 22 2003 8 9 2003 8 27 2003 8 28 2003 9 15 2003 10 3 2003 10 4 PHASE 1 2003 4 3 2003 4 4 2003 4 22 2003 4 23 2003 5 10 2003 5 11 2003 5 29 2003 5 30 2003 6 16 2003 6 17 2003 7 5 2003 7 23 2003 7 24 2003 8 10 2003 8 11 2003 8 29 2003 8 30 2003 9 16 2003 9 17 2003 10 5 2003 10 6 PHASE 2 2003 4 5 2003 4 6 2003 4 24 2003 5 12 2003 5 13 2003 5 31 2003 6 18 2003 6 19 2003 7 6 2003 7 7 2003 7 25 2003 7 26 2003 8 12 2003 8 13 2003 8 31 2003 9 1 2003 9 18 2003 9 19 2003 10 7 PHASE 3 2003 4 7 2003 4 8 2003 4 25 2003 4 26 2003 5 14 2003 5 15 2003 6 1 2003 6 2 2003 6 20 2003 6 21 2003 7 8 2003 7 9 2003 7 27 2003 7 28 2003 8 14 2003 8 15 2003 9 2 2003 9 20 2003 9 21 PHASE 4 2003 4 9 2003 4 10 2003 4 27 2003 4 28 2003 5 16 2003 5 17 2003 6 3 2003 6 4 2003 6 22 2003 6 23 2003 7 10 2003 7 11 2003 7 29 2003 8 16 2003 8 17 2003 9 3 2003 9 4 2003 9 22 2003 9 23 PHASE 5 2003 4 11 2003 4 12 2003 4 29 2003 4 30 2003 5 18 2003 6 5 2003 6 6 2003 6 24 2003 7 12 2003 7 13 2003 7 30 2003 7 31 2003 8 18 2003 8 19 2003 9 5 2003 9 6 2003 9 24 2003 9 25 PHASE 6 2003 4 13 2003 5 1 2003 5 2 2003 5 19 2003 5 20 2003 6 7 2003 6 8 2003 6 25 2003 6 26 2003 7 14 2003 7 15 2003 8 1 2003 8 2 2003 8 20 2003 8 21 2003 9 7 2003 9 8 2003 9 26 PHASE 7 2003 4 14 2003 4 15 2003 5 3 2003 5 4 2003 5 21 2003 5 22 2003 6 9 2003 6 10 2003 6 27 2003 6 28 2003 7 16 2003 7 17 2003 8 3 2003 8 4 2003 8 22 2003 9 9 2003 9 10 2003 9 27 2003 9 28 PHASE 8 2003 4 16 2003 4 17 2003 5 5 2003 5 6 2003 5 23 2003 5 24 2003 6 11 2003 6 29 2003 6 30 2003 7 18 2003 8 5 2003 8 6 2003 8 23 2003 8 24 2003 9 11 2003 9 12 2003 9 29 2003 9 30 Approved Waiver Request Summary ------------------------------- none Critical Observing Condition Constraints ---------------------------------------- none Time Critical Aspects --------------------- See discussion of orbital phase constraints above. Special Calibration Information ------------------------------- ToO Information --------------- This is not a ToO programme. Pre-Imaging Requirements ------------------------ No pre-imaging is required for this programme. OB Information ============== List of Science OBs with Associated Finding Charts -------------------------------------------------- Total Number of Submitted Science OBs: 9 Total Number of Submitted Finding Charts: 2 SeqC.1 = 71.D-0387A.001.ps SeqC.1 = 71.D-0387A.002.ps SeqC.2 = 71.D-0387A.001.ps SeqC.2 = 71.D-0387A.002.ps SeqC.3 = 71.D-0387A.001.ps SeqC.3 = 71.D-0387A.002.ps SeqC.4 = 71.D-0387A.001.ps SeqC.4 = 71.D-0387A.002.ps SeqC.5 = 71.D-0387A.001.ps SeqC.5 = 71.D-0387A.002.ps SeqC.6 = 71.D-0387A.001.ps SeqC.6 = 71.D-0387A.002.ps SeqC.7 = 71.D-0387A.001.ps SeqC.7 = 71.D-0387A.002.ps SeqC.8 = 71.D-0387A.001.ps SeqC.8 = 71.D-0387A.002.ps SeqC.9 = 71.D-0387A.001.ps SeqC.9 = 71.D-0387A.002.ps List of Calibration OBs with Associated Science OBs --------------------------------------------------- Total Number of Submitted Calibration OBs: 0 OB Compliance Checks ==================== (Y = Yes, N = No, NA = Not Applicable) Do all your OBs comply with the instrument specific requirements listed on the instrument specific Phase 2 Web pages ? [Y] If you submitted OBs for standard stars, did you specify the magnitude and spectral type of all standard stars ? [NA] Have you included OBs for any calibrations that you need but which are not a part of the Calibration Plan? [NA] [FORS only] Do all your FORS OBs use only the allowed detector read-out modes listed on the FORS1/FORS2 Phase 2 Web pages? [NA] [FORS only] Do all your FORS MOS/LSS OBs contain the mandatory "through-slit image" template? [NA] [UVES only] Do all your UVES OBs use only the allowed templates listed on the UVES Phase 2 Web pages ? [NA] [ISAAC only] Are ALL the objects in your field-of-view fainter than the magnitude limits specified on the ISAAC Phase 2 Web page ? [Y] [ISAAC only] If you submitted OBs for standard stars, did you use the provided StandardStar templates? [NA] [FLAMES only] Did you specify the hour angle range for which your Target Setup files are valid ? [NA] [WFI only]Are your finding charts 34 arcmin x 34 arcmin? [NA] If you answered "NO" to any of these questions, please revise your OBs *before* submission.