README Template 71.1 ESO Programme ID: 71.D-0179(A) Principal Investigator: Covino Principal Investigator E-mail address: covino@mi.astro.it Principal Investigator Telephone Number: +39 039 9991166 Principal Investigator Postal Address: INAF-Brera Astronomical Observatory, Via E. Bianchi 46, 22055, Merate (LC) Italy Instrument: UT1-FORS1 OPC Priority Class: A OPC Approved Total Execution Time: 12.0 hours Estimated Total Execution Time (including overheads): 12.0 hours README File Submission Date: 24 Mar 2003 Programme Description ===================== General Overview ---------------- This is a imaging linear polarimetry programme consisting of three independent set of observations (polarimetry, R band, retarder plate angles 0, 22.5, 45 and 67.5 degrees). One of us will be permanently available to follow the ToO activation at the mobile phone number +39 335 5815158 (or 3355815158@tim.it). Critical Observing Condition Constraints ---------------------------------------- We only need clear sky conditions. In case the observing conditions are worse the decision about the execution of the submitted ToO depends on the scientific value of the specific event. This issue can be defined only at ToO activation. Time Critical Aspects --------------------- The first observation (2 OBs: ToO 0a - Polariz t+0 day; ToO 0b - Polariz t+0 day) should be executed at the ToO activation, as soon as possible after the burst explosion. The observation was subdivided in 2 independent OBs (less than 1h of execution time each) following the requirements of the ESO USG; however they should mandatory be executed sequentially. The second observation (5 OBs: ToO 1a - Polariz t+1 day; ToO 1b - Polariz t+1 day; ToO 1c - Polariz t+1 day, ToO 1d - Polariz t+1 day, ToO 1d - Polariz t+1 day) should be executed the following night, or if the sky position of the transient allows it, at the end of the same night. The observation was now subdivided in 5 independent OBs (1h of execution time each) always following the requirements of the ESO USG; however they should again be executed sequentially. The third set of observations (7 OBs: ToO 2a - Polariz t+2 day; ToO 2b - Polariz t+2 day; ToO 2c - Polariz t+2 day; ToO 2d - Polariz t+2 day; ToO 2e - Polariz t+2 day; ToO 2f - Polariz t+2 day; ToO 2g - Polariz t+2 day;) should be executed two nights after the first one. Again, we have subdivided the observation in order to avoid to prepare too long OBs. However, we stress this point, they should be executed sequentially. For instance, just to clarify the strategy (that was clearly approved by the ESO committee), if the ToO is activated and executed tonight, a time "t" hours after the GRB detection, the second set of OBs has to be executed a time "2t" after the GRB explosion, i.e. very likely the night after. Eventually, the third set of OBs has to be executed at the time "3t" after the GRB detection, i.e. very likely, two days after the first observation. This rather complex strategy is required due to the intense dynamic evolution of the GRB optical afterglow light curve. I stress that the observations requested within each set of OBs must be performed sequentially without any interruption (if possible, of course). We have also added 3 OBs for the observation of a polarimetric standard star. They are identical and must be executed during each observing night. Special Calibration Information ------------------------------- We only need standard calibration plan plus the observation of a polarimetric standard star for each observing night. ToO Information --------------- This is a ToO programme. Pre-Imaging Information ----------------------- No pre-imaging is required for this programme. OB Information ============== List of Science OBs with Associated Finding Charts -------------------------------------------------- Total Number of Submitted Science OBs: 17 Total Number of Submitted Finding Charts: 0 134890 ToO 1e - Polariz t+1 day 134889 ToO 1d - Polariz t+1 day 134888 ToO 1c - Polariz t+1 day 134887 ToO 1b - Polariz t+1 day 134897 ToO 2g - Polariz t+2 days 134896 ToO 2f - Polariz t+2 days 134895 ToO 2e - Polariz t+2 days 134894 ToO 2d - Polariz t+2 days 134893 ToO 2c - Polariz t+2 days 134892 ToO 2b - Polariz t+2 days 134891 ToO 2a - Polariz t+2 day 134886 ToO 1a - Polariz t+1 day 134880 ToO 0b - Polariz t+0 day 134877 ToO 0a - Polariz t+0 day 134878 ToO - Standard Polariz - t+1 134879 ToO - Standard Polariz - t+0 134844 ToO - Standard Polariz - t+2 Since this is a ToO, it is not possible to submit finding charts. We will send a finding chart with the target coordinates at activation time. The same will be done for the selected standard star to observe. The standard star must be observed any time an OB is executed (i.e. any night). List of Calibration OBs with Associated Science OBs --------------------------------------------------- Total Number of Submitted Calibration OBs: 0 OB Compliance Checks ==================== Y = Yes, N = No, NA = Not Applicable Do all your OBs comply with the instrument specific requirements listed on the instrument specific Phase 2 Web pages [Y/N/NA]? Y If you submitted OBs for standard stars, did you specify the magnitude and spectral type of all standard stars ? [Y/N/NA] NA Have you included OBs for any calibrations that you need but which are not a part of the Calibration Plan? [Y/N/NA] NA Do all your FORS OBs use only the allowed detector read-out modes listed on the FORS1/FORS2 Phase 2 Web pages [Y/N/NA]? Y Do all your FORS MOS/LSS OBs contain the mandatory "through-slit image" template? [Y/N/NA]? NA If you answered "NO" to any of these questions, please revise your OBs *before* submission. Destination Address for Data Products ===================================== Dr. Stefano Covino Osservatorio Astronomico di Brera via E. Bianchi 46 I-23807 Merate (LC) ITALY