README Template 70.1 ESO Programme ID: 70.D-0159A Principal Investigator Name: Robin Principal Investigator E-mail Address: robin@obs-besancon.fr Principal Investigator Telephone Number: +33-381-666-941 Instrument: FORS2 OPC Priority Class: B OPC Approved Total Execution Time: 4.2 Estimated Total Execution Time (including overheads):4.18 README File Submission Date: 14-aug-2002 Programme Description ===================== General Overview ---------------- The program 70.D-0159A consists of imaging for 5 halo white dwarf candidates. The candidates have large proper motions (order of 0.4 arcsec per year) and the position must be checked before doing the spectroscopy (in 70.D-0159B) for the 2 brightest. The objects are very faint (23.9 and 24.1 in I). Waiver Request Summary ---------------------- We have not been granted the permission to use the 1x1 binning for high spatial resolution. So we use the 2x2 binning. The initial program 70.D-0159A has been split into two sequences. The 70.D-0159A concerns the imaging and 70.D-0159B the spectroscopy, the A part should be done before the B in order to check the actual position of moving targets. The waivers have been submitted on 8 august and the answers came on 8 and 10 august. Critical Observing Condition Constraints ---------------------------------------- We asked in phase 1 for a good airmass not larger than 1.2 and seeing less than 0.8. Since the run has been split into 2, the imaging part (this run A) may have conditions slightly worse (in airmass and moon position). The sky should be "CLEAR". We do not require photometric conditions because we have already calibrated images. The calibration will be differential. Time Critical Aspects --------------------- The field is at 2h in right ascension and considering observing conditions, it needs to be done from 1st october to 10th october or from 31 october to 8th november, But this run has to be done as EARLY as possible in order to let time to check target positions and to make the spectroscopic run (70.D-0159B) at the required air mass in the same date ranges with the moon below the horizon. So we prefere dates in october. Special Calibration Information ------------------------------- The photometry will be calibrated differentially with our previous images. So no special needs. ToO Information --------------- NA Pre-Imaging Information ----------------------- NA OB Information ============== List of Science OBs with Associated Finding Charts -------------------------------------------------- Total Number of Submitted Science OBs:5 Total Number of Submitted Finding Charts:5 PRE WD04 = 70.D-0159A.001.ps PRE WD14 = 70.D-0159A.002.ps WD28-img.1 = 70.D-0159A.003.ps WD39-img.1 = 70.D-0159A.004.ps WD41-img.1 = 70.D-0159A.005.ps List of Calibration OBs with Associated Science OBs --------------------------------------------------- Total Number of Submitted Calibration OBs:0 OB Compliance Checks ==================== Y = Yes, N = No, NA = Not Applicable Do all your OBs comply with the instrument specific requirements listed on the instrument specific Phase 2 Web pages [Y]? Do all your FORS OBs use only the allowed detector read-out modes listed on the FORS1/FORS2 Phase 2 Web pages? [Y] Do all your FORS MOS/LSS OBs contain the mandatory "through-slit image" template? [NA]? Do all your UVES OBs use only the allowed templates listed on the UVES Phase 2 Web pages [NA]? If you submitted OBs for standard stars, did you specify the magnitude and spectral type of all standard stars [NA]? [ISAAC only] Are ALL the objects in your field-of-view fainter than the magnitude limits specified on the ISAAC Phase 2 Web page [NA]? [ISAAC only] If you submitted OBs for standard stars, did you use the provided StandardStar templates? [NA]? If you answered "NO" to any of these questions, please revise your OBs *before* submission. Destination Address for Data Products ===================================== Dr. Annie Robin Observatoire astronomique de Besancon BP 1615 F-25010 Besancon cedex FRANCE