README Template 70.1 ESO Programme ID: 70.B-0754 Principal Investigator Name: Salomé Principal Investigator E-mail Address: philippe.salome@obspm.fr Principal Investigator Telephone Number: +33 (0)1.40.51.20.41 Instrument: FORS1 OPC Priority Class: B OPC Approved Total Execution Time: 5.0 Estimated Total Execution Time (including overheads): 04:59:52.0 README File Submission Date: 20 August 2002 Programme Description ===================== General Overview ---------------- This is a long slit spectroscopy program, which consist in observing external regions of the Edge-on galaxy NGC 253 in the Halpha line. Eight sequences of observation are planned in four different configurations : A) SeqA.1 and SeqA.2, the slit is aligned with the major axis of NGC 253. B) SeqB.1 and SeqB.2, the slit is parallel to the major axis, with an offset of 30 arcsec on North. C) SeqC.1 and SeqC.2, the slit is parallel to the major axis, with an offset of 30 arcsec on South. A) SeqD.1 and SeqD.2, the slit is aligned with the major axis of NGC 253, but translanted radially, towards the external regions, of half a field by comparison to SeqA.1 and SeqA.2. For all OB, NO OFFSET IS REQUIRED to define the slit position, COMPARED TO THE ACQUISITION POSITION. No click on a reference object is needed. The slit is covering the observation region when the center of the field is at the target coordinates. Consequeltly, the FORS1_lss_obs_fast template CAN BE SKIPPED. Waiver Request Summary ---------------------- No waiver request. Critical Observing Condition Constraints ---------------------------------------- No critical observing condition constraints. Time Critical Aspects --------------------- No time critical aspects. Special Calibration Information ------------------------------- No special calibration. ToO Information --------------- This is not a ToO Program. Pre-Imaging Information ----------------------- No pre-imaging is required for this programme. OB Information ============== List of Science OBs with Associated Finding Charts -------------------------------------------------- Total Number of Submitted Science OBs: 8 Total Number of Submitted Finding Charts: 8 SeqA.1 = 70.B-0754A.001.ps,70.B-0754A.002.ps SeqA.2 = 70.B-0754A.001.ps,70.B-0754A.002.ps SeqB.1 = 70.B-0754A.003.ps,70.B-0754A.004.ps SeqB.2 = 70.B-0754A.003.ps,70.B-0754A.004.ps SeqC.1 = 70.B-0754A.005.ps,70.B-0754A.006.ps SeqC.2 = 70.B-0754A.005.ps,70.B-0754A.006.ps SeqD.1 = 70.B-0754A.007.ps,70.B-0754A.008.ps SeqD.2 = 70.B-0754A.007.ps,70.B-0754A.008.ps List of Calibration OBs with Associated Science OBs --------------------------------------------------- Total Number of Submitted Calibration OBs: 0 OB Compliance Checks ==================== Y = Yes, N = No, NA = Not Applicable Do all your OBs comply with the instrument specific requirements listed on the instrument specific Phase 2 Web pages [Y]? Do all your FORS OBs use only the allowed detector read-out modes listed on the FORS1/FORS2 Phase 2 Web pages? [Y] Do all your FORS MOS/LSS OBs contain the mandatory "through-slit image" template? [Y]? Do all your UVES OBs use only the allowed templates listed on the UVES Phase 2 Web pages [NA]? If you submitted OBs for standard stars, did you specify the magnitude and spectral type of all standard stars [NA]? [ISAAC only] Are ALL the objects in your field-of-view fainter than the magnitude limits specified on the ISAAC Phase 2 Web page [NA]? [ISAAC only] If you submitted OBs for standard stars, did you use the provided StandardStar templates? [NA]? If you answered "NO" to any of these questions, please revise your OBs *before* submission.