README Template 70.1 ESO Programme ID: 70.B-0206(A) Principal Investigator Name: Ulrich Hopp Principal Investigator E-mail Address: hopp@usm.uni-muenchen.de Principal Investigator Telephone Number: (+89) 2180 5997 Instrument: FORS1 OPC Priority Class: A OPC Approved Total Execution Time: 4.2 Estimated Total Execution Time (including overheads): README File Submission Date: Programme Description ===================== General Overview ---------------- This program is a relatively simple imaging program with UT1-FORS1 on a total of 5 individual target positions. For each position, I prepared one OB of 49.75 min. excecution time. Within the individual OBs, five I band and three V band (Bessel filters) images are excecuted. Waiver Request Summary ---------------------- Critical Observing Condition Constraints ---------------------------------------- All OBs should be carried out with 0.6" FWHM seeing or better. No moon above horizon is also essential (deep imaging) while pointing is NOT critical: The objects are rather extended and it is NOT necessary to improve the pointing to levels better than about 10". Given what I learned during my visitor runs with UT1 and UT2, the immediate pointing of UT1 should be good enough. The observer executing these OBs should be aware that we do not expect that a special object will be easily visible. Time Critical Aspects --------------------- Special Calibration Information ------------------------------- Standard calibration for broad band imaging including bias, sky flats, and the standard star fields taking at the start and end of each night are good enough. The standard calibration OBs as available at Paranal can be used, therefore, no own calibration OBs will be submitted. ToO Information --------------- This is not a ToO programme. Pre-Imaging Information ----------------------- No pre-imaging is required for this programme. OB Information ============== List of Science OBs with Associated Finding Charts -------------------------------------------------- 70.B-0206A.001 70.B-0206A.003 70.B-0206A.005 70.B-0206A.007 70.B-0206A.008 70.B-0206A.001.ps 70.B-0206A.003.ps 70.B-0206A.005.ps 70.B-0206A.007.ps 70.B-0206A.008.ps Total Number of Submitted Science OBs: 5 Total Number of Submitted Finding Charts: 5 List of Calibration OBs with Associated Science OBs --------------------------------------------------- Total Number of Submitted Calibration OBs: 0 OB Compliance Checks ==================== Y = Yes, N = No, NA = Not Applicable Do all your OBs comply with the instrument specific requirements listed on the instrument specific Phase 2 Web pages [Y/N/NA]? Y Do all your FORS OBs use only the allowed detector read-out modes listed on the FORS1/FORS2 Phase 2 Web pages? [Y/N/NA] Y Do all your FORS MOS/LSS OBs contain the mandatory "through-slit image" template? [Y/N/NA]? NA Do all your UVES OBs use only the allowed templates listed on the UVES Phase 2 Web pages [Y/N/NA]? NA If you submitted OBs for standard stars, did you specify the magnitude and spectral type of all standard stars [Y/N/NA]? NA [ISAAC only] Are ALL the objects in your field-of-view fainter than the magnitude limits specified on the ISAAC Phase 2 Web page [Y/N/NA]? NA [ISAAC only] If you submitted OBs for standard stars, did you use the provided StandardStar templates? [Y/N/NA]? NA If you answered "NO" to any of these questions, please revise your OBs *before* submission. Destination Address for Data Products ===================================== Dr. Ulrich Hopp Universitaets-Sternwarte Muenchen Scheiner Str. 1 D-89679 Muenchen GERMANY