README Template 69.1 ESO Programme ID: 69.B-0292(C) Principal Investigator Name: D. Minniti Principal Investigator E-mail Address: dante@astro.puc.cl Principal Investigator Telephone Number: +56-2-686 4946 Contact Person Name: Marina Rejkuba Contact Person E-mail Address: mrejkuba@eso.org Contact Person Telephone Number: +49-89-3200-6418 Instrument: ISAAC OPC Priority Class: A OPC Approved Total Execution Time: 3.0 h Estimated Total Execution Time (including overheads): 3.0 h README File Submission Date: 18 February 2002 Programme Description ===================== General Overview ---------------- This is a continuation of our programms 63.N-0229, 65.N-0164, 67.B-0503 and 68.B-0129. It is a simple imaging programme. There are two independent sequences, each one on one field. This is the third run (C) out of seven (A, B, C, D, E, F and G) approved parts within this programme. Waiver Request Summary ---------------------- WaiverID: 69.B-0292C.01 We have requested that our OBs have duration of 1.5 hours. This programme has already been carried out in Periods 63 (63.N-0229A,B,C), 65 (65.N-0164A,B,C,D), 67 (67.B-0503B,C,D) and 68 (68.B-0129A-E). On basis of our experience from those 4 periods we can obtain best results with 1.5 hour imaging sequences. Splitting each sequence into two shorter OBs would bring additional overheads. Having a single OB for each sequence, the imaging of each sequence is independent from others and can be carried out even on different nights. The request was approved by F. Comeron on February 18. Critical Observing Condition Constraints ---------------------------------------- Seeing: maximum 0.8 arcsec. From the previous experience with ISAAC data obtained on the same fields, good seeing is critical for a good sky subtraction because of the crowded fields. Also seeing in K band is often better than 0.8 arcsec as our data from Period 63 and 65 show (all the images were taken with seeing better than 0.6 arcsec). Time Critical Aspects --------------------- 5 approved runs of Ks imaging within this programme A, B, C, D and E have to be executed during: Run A (OBs: "N5128F1 Ks baseline" and "N5128F2 Ks baseline"): 10 April - 30 April 2002 Run B (OBs: "N5128F1 Ks baseline +1" and "N5128F2 Ks baseline +1") should be executed 20-30 days after Run A and 15-20 days before the Run C: 1 May - 15 May 2002 Run C (OBs: "N5128F1 Ks baseline +2" and "N5128F2 Ks baseline +2") should be executed 15-20 days after Run B and 20-25 days before the Run D: 15 May - 31 May 2002 Run D (OBs: "N5128F1 Ks baseline +3" and "N5128F2 Ks baseline +3") should be executed 20-25 days after Run C and 25-40 days before the Run E: 10 June - 30 June 2002 Run E (OBs: "N5128F1 Ks baseline +4" and "N5128F2 Ks baseline +4") should be executed 25-40 days after Run D: 15 July - 30 July 2002 Special Calibration Information ------------------------------- No special calibration is required, but only the standard calibrations provided by the ESO calibration plan. ToO Information --------------- This is not a ToO programme. Pre-Imaging Information ----------------------- No pre-imaging is required for this programme. OB Information ============== List of Science OBs with Associated Finding Charts -------------------------------------------------- Total Number of Submitted Science OBs: 2 Total Number of Submitted Finding Charts: 2 Run = OB = Finding Chart 69.B-0292(C) = "N5128F1 Ks baseline+2" = 69.B-0292C.001.ps 69.B-0292(C) = "N5128F2 Ks baseline+2" = 69.B-0292C.002.ps All the finding charts are produced from the ISAAC images in Ks band obtained in period 63. The field of view is the 2.5x2.5 arcmin FOV of ISAAC. There are no bright objects (i.e. no object would be saturated in 10s DIT) in any of the two fields. List of Calibration OBs with Associated Science OBs --------------------------------------------------- Total Number of Submitted Calibration OBs: 0 OB Compliance Checks ==================== Y = Yes, N = No, NA = Not Applicable Do all your OBs comply with the instrument specific requirements listed on the instrument specific Phase 2 Web pages [Y/N/NA]? Y Do all your FORS OBs use only the allowed detector read-out modes listed on the FORS1/FORS2 Phase 2 Web pages? [Y/N/NA] NA Do all your FORS MOS/LSS OBs contain the mandatory "through-slit image" template? [Y/N/NA]? NA Do all your UVES OBs use only the allowed templates listed on the UVES Phase 2 Web pages [Y/N/NA]? NA If you submitted OBs for standard stars, did you specify the magnitude and spectral type of all standard stars [Y/N/NA]? NA [ISAAC only] Are ALL the objects in your field-of-view fainter than the magnitude limits specified on the ISAAC Phase 2 Web page [Y/N/NA]? Y [ISAAC only] If you submitted OBs for standard stars, did you use the provided StandardStar templates? [Y/N/NA]? NA If you answered "NO" to any of these questions, please revise your OBs *before* submission. Destination Address for Data Products ===================================== Dante Minniti Departamento de Astronomia Pontificia Univ. Catolica de Chile Vicuna Mackenna 4860 Casilla 306, Santiago 22 Chile