README Template 68.1 ESO Programme ID: 68.D-0114(A) Principal Investigator: Jesper Sollerman Contact Person Name: Jesper Sollerman Contact Person E-mail Address: jsollerm@eso.org Contact Person Telephone Number: +49 89 32006423 (internal eso 6423) Instrument: FORS1 OPC Priority Class: A OPC Approved Total Execution Time: 4.5 hours Estimated Total Execution Time (including overheads): 04h 35m (OB Execution Time Report) (This includes 5 Target Acquisitions for the same field, i.e., execution time overestimated) README File Submission Date: 2001-08-13 Programme Description ===================== General Overview ---------------- BVRI photometry of Supernova 2000cx. Continuation of P67 programme to follow evolution of this supernova in optical and IR. Waiver Request Summary ---------------------- Critical Observing Condition Constraints ---------------------------------------- Time Critical Aspects --------------------- This observation is coordinated with the other runs in this proposal, as well as with 2 runs in Period 67 to monitor time-evolution of the SN. Period 67 executed in July 2001 and September 2001. The P68 observing run should be made in late 2001, to ensure enough timespan from the September observations. This is the observability: Date (eve) moon eve cent morn night hrs@sec.z: HA sec.z HA sec.z HA sec.z <3 <2 <1.5 2001 Nov 14 N -2 01 1.4 1 57 1.4 5 54 down 6.2 5.4 4.3 2001 Nov 30 F -0 43 1.2 3 05 1.8 6 52 down 4.9 4.1 3.0 2001 Dec 14 N 0 23 1.2 4 06 2.8 7 48 down 3.8 3.0 1.9 2001 Dec 29 F 1 30 1.3 5 12 8.6 8 55 down 2.7 1.9 0.8 2002 Jan 12 N 2 25 1.5 6 14 down 10 02 down 1.8 0.9 0.0 2002 Jan 28 F 3 22 2.0 7 21 down 11 20 down 0.8 0.0 0.0 68.D-0114(A) FORS run. Need darkish time. Should be done in December 2001, around new moon. This is the last chance as object is disappearing into seasonal gap. The new moon around Nov 14 is therefore also acceptable!! 68.D-0114(B) This is the corresponding ISAAC run. We want 'simultaneous' photometry in optical and IR to construct a bolometric lightcurve. This means that Run B should be executed in connection to run A, in the period between the November and December new moons (i.e, within ~2 weeks from the optical observations). NB. All OBs in run A should be executed at the same time, ie within a week or so. They will be combined to give total optical luminosity at the given epoch. Special Calibration Information ------------------------------- ToO Information --------------- Pre-Imaging Information ----------------------- OB Information ============== List of Science OBs with Associated Finding Charts -------------------------------------------------- SN2000cx_P68_B SN2000cx_P68_V SN2000cx_P68_R SN2000cx_P68_I_1 SN2000cx_P68_I_2 These are all pure imaging. I have split of the observations per filter for convenience at the telescope, execution time always less than one hour, but please try to execute them 'simultaneously', i.e., within a few days from each other as they will be combined to 'bolometric luminosity' for the SN at same epoch. http://www.eso.org/~jsollerm/SN2000cx.html Below are 4 finding charts, 68.D-0114A.001.ps 68.D-0114A.002.ps 68.D-0114A.003.ps 68.D-0114A.004.ps descriptions of findingcharts: 68.D-0114_1.ps This DSS image show the 10x10 arcmin field around SN 2000cx. North is up, East to the left. The position of the supernova is marked by a X. 68.D-0114_2.ps DSS 5x5 arcminutes blowup, arrow marks position of supernova. 68.D-0114_3.ps A V image from YALO showing the supernova. FOV 5 x 10 arcmin. E up and S left The SN is clearly marked by arrow. Shows SN near maximum. 68.D-0114_4.ps Recent FORS1 image of the supernova (July 2001). I-band. (all findingcharts and info can also be downloaded from http://www.eso.org/~jsollerm/SN2000cx.html) Total Number of Submitted Science OBs:5 Total Number of Submitted Finding Charts:4 List of Calibration OBs with Associated Science OBs --------------------------------------------------- Total Number of Submitted Calibration OBs:0 OB Compliance Checks ==================== Destination Address for Data Products ===================================== Jesper Sollerman ESO Karl-Schwarzschild-Strasse 2 D-85748 Garching bei Munchen Germany Please do not hesitate to ask if anything is unclear!! jesper *************************************** DO NOT WRITE BELOW THESE LINES!!!!!!!!! ***************************************