README Template 69.1 ESO Programme ID: 269.D-5046 Principal Investigator Name: R. I. Hynes Principal Investigator E-mail Address: rih@astro.soton.ac.uk Principal Investigator Telephone Number: +44 23 80592112 Instrument: UVES OPC Priority Class: A OPC Approved Total Execution Time: 12 hours Estimated Total Execution Time (including overheads): 12 hours README File Submission Date: 06/08/02 Programme Description ===================== General Overview ---------------- We wish to obtain 6x2 hr observations of GX339-4 as soon as possible; hence this was submitted, and approved, as a Priority A DDT proposal. Each observation is 2hrs in order to allow us to reliably measure the rate of change of line wavelengths (due to Doppler shifts) at each epoch as well as the mean wavelength. Waiver Request Summary ---------------------- We are executing exactly the observations proposed for in our DDT proposal, and as were approved. These are urgent observations so any further delays will compromise our science. We hope that we will not have to wait for any waivers. Critical Observing Condition Constraints ---------------------------------------- None - our constraints are modest. Time Critical Aspects --------------------- Our target is a transient source currently in outburst, hence our proposal should be executed urgently. We would ideally like our 6 observations to be executed on consecutive nights. If that is not possible, then scheduling two on the same night, or having intervals of larger than a day would be acceptable. Special Calibration Information ------------------------------- None - standard calibrations are adequate. ToO Information --------------- N/A Pre-Imaging Information ----------------------- None OB Information ============== List of Science OBs with Associated Finding Charts -------------------------------------------------- Total Number of Submitted Science OBs: 1 Total Number of Submitted Finding Charts: 1 List of Calibration OBs with Associated Science OBs --------------------------------------------------- Total Number of Submitted Calibration OBs: 0 OB Compliance Checks ==================== Y = Yes, N = No, NA = Not Applicable Do all your OBs comply with the instrument specific requirements listed on the instrument specific Phase 2 Web pages [Y/N/NA]? Y Do all your FORS OBs use only the allowed detector read-out modes listed on the FORS1/FORS2 Phase 2 Web pages? [Y/N/NA] NA Do all your FORS MOS/LSS OBs contain the mandatory "through-slit image" template? [Y/N/NA]? NA Do all your UVES OBs use only the allowed templates listed on the UVES Phase 2 Web pages [Y/N/NA]? Y If you submitted OBs for standard stars, did you specify the magnitude and spectral type of all standard stars [Y/N/NA]? NA [ISAAC only] Are ALL the objects in your field-of-view fainter than the magnitude limits specified on the ISAAC Phase 2 Web page [Y/N/NA]? NA [ISAAC only] If you submitted OBs for standard stars, did you use the provided StandardStar templates? [Y/N/NA]? NA If you answered "NO" to any of these questions, please revise your OBs *before* submission. Destination Address for Data Products ===================================== Dr R. I. Hynes Department of Physics and Astronomy University of Southampton Southampton Hampshire SO17 1BJ United Kingdom