README Template 73.1 (please do not delete the README Template Version line!) ESO Programme ID: 171.A-3054(B) Principal Investigator Name: Emanuele Giallongo Principal Investigator E-mail Address: giallo@mporzio.astro.it Principal Investigator Telephone Number: +39-06-94286411 Principal Investigator Postal Address: Osservatorio Astronomico di Roma / Via di Frascati 33 / I-00040 Monte Porzio Catone / Italy Instrument: VIMOS OPC Priority Class: A OPC Approved Total Execution Time: 14.5 hours P73 + 23 hours P71 Estimated Total Execution Time (including overheads): 51h 06m 45s README File Submission Date: 25 Feb 2004 Programme Description ===================== Large program for ultradeep IFU observations of the Hubble Deep Field South. Two runs have been allocated both for P71 and P73: P71: 35 hours in run A for LRred grism observations, 23 hours in run B for LRblue grism observations, for a total of 58 hours. P73: 47.5 hours in run A for LRred grism observations and 14.5 hours in run B for LRblue grism observations, for a total of 62 hours. In both periods, to best execute our program we have been allowed to move time from one run to the other. Above we reported the total execution time for the OBs we submitted for run B, as estimated by P2PP (including overheads). General Overview ---------------- For run 171.A-3054(B) we have submitted a total of 30 OBs: - 10 OBs from P71, re-submitted after revision to make them compatible with the new OB policy for IFU. These OBs are for pointing P1 on the HDFS. Total execution time estimated by P2PP for these OBs is 17h 02m 15s - 20 new OBs for P73, 10 OBs for pointing P2 and 10 for pointing P3 on the HDFS. Total execution time estimated by P2PP for these OBs is 34h 04m 30s . Each OB consists of acquisition plus 2 exposures 40 min each with the LR blue grism, jitter mode, plus one night calibration template as required for IFU. The jitter sequence is completed with 10 OBs (increasing number in OB names). OBs for LR blue observations should be executed preferably with moon below the horizon. Approved Waiver Request Summary ------------------------------- We have requested to exceed the OB execution time limit of 1 hour and to move time from run A to run B. A waiver request has been submitted on 17 Feb 2004 and approved on 18 Feb 2004. P71 OBs: a waiver request to submit a number of OBs exceeding the total allocated time was submitted on 7 April 2003 and approved on 8 April 2003. Critical Observing Condition Constraints ---------------------------------------- No critical observing condition constraints. Time Critical Aspects --------------------- No time-critical aspects. Special Calibration Information ------------------------------- No special calibrations have been requested. ToO Information --------------- This is not a ToO programme. Pre-Imaging Requirements ------------------------ No preimaging is required for this programme. Source of preimaging: not applicable OB Information ============== List of Science OBs ------------------- (for ISAAC imaging, please indicate the magnitude of the brightest star in the field for each OB) sciHDFS_P1_LRblue-1 sciHDFS_P1_LRblue-2 sciHDFS_P1_LRblue-3 sciHDFS_P1_LRblue-4 sciHDFS_P1_LRblue-5 sciHDFS_P1_LRblue-6 sciHDFS_P1_LRblue-7 sciHDFS_P1_LRblue-8 sciHDFS_P1_LRblue-9 sciHDFS_P1_LRblue-10 sciHDFS_P2_LRblue-1 sciHDFS_P2_LRblue-2 sciHDFS_P2_LRblue-3 sciHDFS_P2_LRblue-4 sciHDFS_P2_LRblue-5 sciHDFS_P2_LRblue-6 sciHDFS_P2_LRblue-7 sciHDFS_P2_LRblue-8 sciHDFS_P2_LRblue-9 sciHDFS_P2_LRblue-10 sciHDFS_P3_LRblue-1 sciHDFS_P3_LRblue-2 sciHDFS_P3_LRblue-3 sciHDFS_P3_LRblue-4 sciHDFS_P3_LRblue-5 sciHDFS_P3_LRblue-6 sciHDFS_P3_LRblue-7 sciHDFS_P3_LRblue-8 sciHDFS_P3_LRblue-9 sciHDFS_P3_LRblue-10 Total Number of Submitted Science OBs: 30 List of Calibration OBs with Associated Science OBs --------------------------------------------------- Total Number of Submitted Calibration OBs: 0 OB Compliance Checks ==================== (Y = Yes, N = No, NA = Not Applicable) Do all your OBs comply with the instrument specific requirements listed on the instrument specific Phase 2 Web pages ? [Y] Do all your Finding Charts comply with the both the general and instrument-specific finding chart requirements? [Y] If you submitted OBs for standard stars, did you specify the magnitude and spectral type of all standard stars ? [NA] Have you included OBs for any calibrations that you need but which are not a part of the Calibration Plan? [NA] [UVES only] Do all your UVES OBs use only the allowed templates listed on the UVES Phase 2 Web pages ? [NA] [ISAAC only] Did you indicate the magnitude of the brightest star in the field for ISAAC imaging observations? [NA] [ISAAC only] If you submitted OBs for standard stars, did you use the provided StandardStar templates? [NA] [FLAMES only] Did you specify the hour angle range for which your Target Setup files are valid ? [NA] [VIMOS only] Did you specify suitable guide stars for all your OBs using Guidecam? [NA] [VIMOS only] Did you check that the chosen guide stars are suitable for all the offset positions and that they do not produce unacceptable vignetting of the field of view? [NA] [MIDI only] Did you indicate for each science star OB the corresponding calibrator star OB name in the ReadMe file as well as in the comments of the OB ? [NA] [MIDI only] If you use calibrator stars which are not in the CalVin database, did you specify their characteristics in the ReadMe file and in the OBs ? [NA] If you answered "NO" to any of these questions, please revise your OBs *before* submission.