README Template 73.1 (please do not delete the README Template Version line!) ESO Programme ID: 073.D-0304(B) Principal Investigator Name: Reba Bandyopadhyay Principal Investigator E-mail Address: rmb@astro.ox.ac.uk Principal Investigator Telephone Number: 44 1865 283106 Principal Investigator Postal Address: Dept. of Astrophysics / Oxford University / Keble Road / Oxford OX1 3RH / U.K. Instrument: NACO OPC Priority Class: A OPC Approved Total Execution Time: 4.0 hrs Estimated Total Execution Time (including overheads): 4.0 hrs README File Submission Date: 25 February 2004 Programme Description ===================== General Overview ---------------- Run 073.D-0304(B) is one of two temporally-coupled runs, 073.D-0304(A-B), to obtain deep K-band imaging of a black hole X-ray transient (BHXRT) at three epochs after the transient begins an X-ray/radio outburst. Approved Waiver Request Summary ------------------------------- As the 4 1-hr OBs for each of the two runs need to be executed contiguously, Waiver Requests for both runs were submitted on 17 February and approved on 18 February. The Waiver Requests and their approval conditions are the same as those granted to this program in Period 72 (program ID 072.D-0368A). The approval was granted with the following restriction: Your requested Waivers for 072.D-0368(ABC) [HERE APPLICABLE TO 073.D-0304(A) and 073.D-0304(B)] can be granted with the restriction that if the conditions degrade in violation of the constraints after the first hour, the sequence will be completed anyway and it will not be repeated. Critical Observing Condition Constraints ---------------------------------------- To image the faint jet structures around the bright central BHXRT, we request that these observations be performed with 0.6" seeing or better. However, it is also critical that *all* OBs for each run be executed consecutively once the run is triggered. We require the ~3 hours of integration time for each run (4 hours with overheads) in order to obtain images down to a depth of K=23-24. The jets which we are attempting to image are not only faint but also evolve with time, moving outward from the central source. Thus co-adding observations obtained over several nights would likely 'smear' any image of the jets, possibly to the point of undetectability. We recognize that it is not possible to guarantee 4 hours of continuous <0.6" seeing, but given the various constraints necessary for success of this program, we must require all four OBs for each run be executed consecutively on the same night. Once this program is triggered, we are flexible as to the actual start of observations, within a window of ~1 week. Therefore we hope that it would be possible to choose to execute this program on a night where the seeing is proving to be both very good (0.6") and fairly stable (i.e. without significant excursions to intervals of ~0.8" or worse.) Time Critical Aspects --------------------- We request that the initial observation be obtained within 1 week after we trigger our ToO program. The second observation should be obtained 12-15 days after the first. We will contact the Paranal observer for each observation to specify which OB should be used. Special Calibration Information ------------------------------- None. ToO Information --------------- The first epoch of observation will be triggered when a BHXRT undergoing an X-ray outburst is observed to have extended radio jets or an exceptionally strong radio flare (the radio data will be obtained by one of our team using the VLA or VLBI). We request that the first observation be obtained as soon as possible after our trigger (within ~1 week); as we require <0.6" seeing for all observations in this program, we are somewhat flexible as to how quickly we want the data to be taken once we have submitted our trigger request. We would then request that the second observation be obtained ~12-15 days after the first observation. We have designed three OBs for this program. The first, TOO-BHXRT-bright, should be used if the central BHXRT is bright (K~12-13). The second, TOO-BHXRT-intermediate, should be used if the BHXRT has a magnitude of K~14. The second, TOO-BHXRT-faint, should be used if the BHXRT is faint (K>15). When we trigger the initial observation, we will specify which of these OBs should be used. However, as our target will be a transient, its IR magnitude will likely begin to decrease between the initial observation and the subsequent one. We will monitor the BHXRT at other telescopes and track its optical/IR magnitude through the outburst. Therefore for the later epoch of observation, we may request, for example, that TOO-BHXRT-faint OB be executed for one or both of the later observations, even if the initial epoch was done using the TOO-BHXRT-bright OB. We will contact the Paranal observer with the information as to which OB should be used for the latter observation at the beginning of the observing windows we specified above. For each epoch of observation we were awarded 4 hours of time. As OBs are limited to 1-hr duration, we have designed all three OB types to be 1-hr long. Thus there are four TOO-BHXRT-bright OBs, numbered A1, A2, A3, and A4, and similarly there are four OBs for the intermediate and faint target options. We have therefore submitted 12 OBs for this run. Two people are authorized to activate this ToO program: Reba Bandyopadhyay - rmb@astro.ox.ac.uk (PI) Katherine Blundell - kmb@astro.ox.ac.uk Pre-Imaging Requirements ------------------------ None. OB Information ============== List of Science OBs with Associated Finding Charts -------------------------------------------------- Total Number of Submitted Science OBs: 12 Total Number of Submitted Finding Charts: 0 List of Calibration OBs with Associated Science OBs --------------------------------------------------- Total Number of Submitted Calibration OBs: 0 Phase 2 package Compliance Checks ================================= (Y = Yes, N = No, NA = Not Applicable) Do all your OBs comply with the instrument specific requirements listed on the instrument specific Phase 2 Web pages ? [Y] Do all your Finding Charts comply with the both the general and instrument-specific finding chart requirements? [NA] If you submitted OBs for standard stars, did you specify the magnitude and spectral type of all standard stars ? [NA] Have you included OBs for any calibrations that you need but which are not a part of the Calibration Plan? [NA] [UVES only] Do all your UVES OBs use only the allowed templates listed on the UVES Phase 2 Web pages ? [NA] [ISAAC only] Are ALL the objects in your field-of-view fainter than the magnitude limits specified on the ISAAC Phase 2 Web page ? [NA] [ISAAC only] If you submitted OBs for standard stars, did you use the provided ISAAC*_*_cal_* templates? [NA] [FLAMES only] Did you specify the hour angle range for which your Target Setup files are valid ? [NA] [VIMOS only] Did you specify suitable guide stars for all your OBs using Guidecam? [NA] [VIMOS only] Did you check that the chosen guide stars are suitable for all the offset positions and that they do not produce unacceptable vignetting of the field of view? [NA] [MIDI only] Did you indicate for each science star OB the corresponding calibrator star OB name in the ReadMe file as well as in the comments of the OB ? [NA] [MIDI only] If you use calibrator stars which are not in the CalVin database, did you specify their characteristics in the ReadMe file and in the OBs ? [NA] If you answered "NO" to any of these questions, please revise your OBs *before* submission.