README Template 72.1 ESO Programme ID: 072-C-0525 (C) Principal Investigator Name: E. Lellouch Principal Investigator E-mail Address: emmanuel.lellouch@obspm.fr Principal Investigator Telephone Number: 33-1-45077672 Instrument: ISAAC OPC Priority Class: B OPC Approved Total Execution Time: 8 h Estimated Total Execution Time (including overheads): 8 h 15 min (max.) README File Submission Date: 15 August 2003 - Revised 12 September 2003 Re-revised 23 January 2004. NOTE: THIS README FILE HAS BEEN UPDATED AND THE OBSERVATION WINDOW HAS BEEN EXTENDED DUE TO ISAAC UNAVAILABILITY DURING OPTIMUM TIME. Programme Description ===================== The goal of the programme is an exploration of Titan's 4 micron spectrum. It includes two distinct parts. Part 1 consists of repeated (2) observations of Titan's 3.90-4.15 micron spectrum with ISAAC LWS3-MR, corresponding to 2 different positions of Titan on its orbit around Saturn. This part, which corresponds to runs A and B, is therefore time-critical. Part 2 (run C) consists of one observation of Titan's 3.65-3.90 micron spectrum with ISAAC LWS3-MR. It can be performed at any time. Each Titan observation must be accompanied by observations of two telluric standards at a similar airmass. General Overview ---------------- Spectra of Titan are to be taken with ISAAC LWS3-MR. Two central wavelengths are required (4.03 and 3.78 micron). The observations at 4.03 micron must be repeated two times (runs A and B), corresponding to different positions of Titan on its orbit around Saturn. As such they are time critical. The observations at 3.78 micron (run C) must be performed only once, and are not time critical. The same telluric standards (HR2354 and HR4523) should be used for all three runs. In order to maximize the signal from Titan, all three runs must be conducted as close as possible from Titan's opposition, which occurs on December 30, 2003 (and not December 12, 2003, as incorrectly stated in the proposal). Because of Titan Northern declination, the observations must be perfomed within approx. +/-1h30 from Titan maximum elevation, which occurs near LST = 6h45 h (approx. UT ~ 5 h in late December 2003). THE MAXIMUM AIRMASS for TITAN MUST NOT EXCEED 1.7. RUN C In this case, the required integration time on Titan is such that it cannot fit in a single OB. A 1hr23mn30sec long OB has been defined, and should be executed two times. Provide that the Titan observations start 1h30 before Titan's maximum elevation, it is possible to execute the two OBs in a row -- along with the calibration OBs -- and still be consistent with the maximum tolerable airmass value (1.7). Nevertheless, it is not mandatory to do so. For simplicity, the telluric standards are the same as for runs A and B, and again they should be observed at similar airmasses as Titan (~ 1.5). Dates to be excluded: nights of Dec. 9,10,11, and January 5,6,7 (chilean time) due to Moon proximity (please check!) Waiver Request Summary ---------------------- For run C, the Titan OBs last 1h23mn30 each. For this reason, a waiver has been requested and granted (S. Mengel's mail of Sept. 2, 2003) Critical Observing Condition Constraints ---------------------------------------- Seeing must be better than 1", clear sky or better. Maximum airmass for Titan: 1.7 Time Critical Aspects --------------------- The observations are not time critical. They can be performed any time except during the chilean nights of Dec. 9,10,11 and January 5,6,7 (please check!) due to Moon proximity. Because of the variation of Titan RA, DEC, and proper motion, we enclose one ephemeris file (072.C-0525C.002.eph.gz) with all the necessary information. Note that the file includes also the position angle that is necessary for slit orientation: indeed it is desirable that the slit be oriented in the direction of the target proper motion. NOTE THAT THE OBSERVING CONDITIONS DEGRADE SIGNIFICANTLY AS TITAN'S DISTANCE TO EARTH INCREASES , SO THAT ALL EFFORTS SHOULD BE MADE FOR OBSERVATIONS TO BE PERFORMED IN FEBRUARY 2004. Special Calibration Information ------------------------------- Telluric standards HR4523 and HR2354 to be observed. ToO Information : NA --------------- Pre-Imaging Information: not required ----------------------- OB Information: ============== Run C also includes six different OBs: two (identical) for Titan (MOV_titan_378.obx and MOV_titan_378-0.obx), and two (identical) for each of the stars (CAL_HR2354_378.obx and CAL_HR2354_378-0.obx, CAL_HR4523_378.obx and CAL_HR4523_378-0.obx ). Each time one Titan OB is executed, it must be accompanied by one OB for each of the star. The execution time for (Titan+HR2354+HR4523) is 1h23mn30sec + 18mn30sec+18mn30sec = 2h00mn30 sec. Thus, if run C is executed on two separate nights, the total execution time is 4h01mn. However, it is also possible to execute the two Titan OBs in a row -- still satisfying the maximum 1.7 airmass. In this case, only one calibration OB has be to performed for each star, and the total execution time for run C is then only 2x(1h23min30sec) + 18.5min + 18.5 min = 3h24min. Along with runs A and B, the grand total execution time is therefore 8h15mn or 7h38 min. The OB are described in details assuming as an example that the observations will be performed on January 2004, 1, UT= 4h. For an observation at any other date, from the information given in the ephemeris, one has to change the values of RA, DEC, Add Velocity Alpha, Add Velocity Delta, and Position Angle on Sky. All other fields remain the same. List of Science OBs with Associated Finding Charts -------------------------------------------------- MOV_titan_378 MOV_titan_378-0 Total Number of Submitted Science OBs: 2 Total Number of Submitted Finding Charts: 0 List of Calibration OBs with Associated Science OBs --------------------------------------------------- CAL_HR2354_378 CAL_HR2354_378-0 CAL_HR4523_378 CAL_HR4523_378-0 Total Number of Submitted Calibration OBs: 4 OB Compliance Checks ==================== Y = Yes, N = No, NA = Not Applicable Do all your OBs comply with the instrument specific requirements listed on the instrument specific Phase 2 Web pages [Y/N/NA]? Y Do all your FORS OBs use only the allowed detector read-out modes listed on the FORS1/FORS2 Phase 2 Web pages? [Y/N/NA] NA Do all your FORS MOS/LSS OBs contain the mandatory "through-slit image" template? [Y/N/NA]?NA Do all your UVES OBs use only the allowed templates listed on the UVES Phase 2 Web pages [Y/N/NA]? NA If you submitted OBs for standard stars, did you specify the magnitude and spectral type of all standard stars [Y/N/NA]? Y [ISAAC only] Are ALL the objects in your field-of-view fainter than the magnitude limits specified on the ISAAC Phase 2 Web page [Y/N/NA]? Y [ISAAC only] If you submitted OBs for standard stars, did you use the provided StandardStar templates? [Y/N/NA]? Y If you answered "NO" to any of these questions, please revise your OBs *before* submission.