README Template 72.1 (please do not delete the README Template Version line!) ESO Programme ID: 072.A-0508(B) Principal Investigator Name: Arne Rau Principal Investigator E-mail Address: arau@mpe.mpg.de Principal Investigator Telephone Number: +49-89-30000-3358 Principal Investigator Postal Address: Max-Planck-Institute for extraterrestrail Physics / Giessenbachstr. 1 / 85748 Garching / Germany Instrument: VIMOS OPC Priority Class: B OPC Approved Total Execution Time: 6.0 Estimated Total Execution Time (including overheads): 5.9 README File Submission Date: 29 January 2004 Programme Description ===================== General Overview ---------------- IFU observation of a single target (+ standard star) with two different grisms. Approved Waiver Request Summary ------------------------------- An waiver request (72.A-0508B.01) was approved allowing to extend the OB duration to 1:45 hrs. Critical Observing Condition Constraints ---------------------------------------- For OB "GRB011121_R", "GRB011121_B-1" and "GRB011121_B-2" a seeing of 0.6" and a lunar illumination of 0.4 is needed. Time Critical Aspects --------------------- There are no time critical aspects. Special Calibration Information ------------------------------- The provided OBs for standard star LTT4364 should be executed in the same night as the corresponding science. ToO Information --------------- This is not a ToO programme. Pre-Imaging Requirements ------------------------ No pre-imaging is required for this programme. OB Information ============== List of Science OBs with Associated Finding Charts -------------------------------------------------- Total Number of Submitted Science OBs: 5 Total Number of Submitted Finding Charts: 4 GRB011121_R = 072.A-0508B.001.ps, 072.A-0508B.002.ps GRB011121_B-1 = 072.A-0508B.001.ps, 072.A-0508B.002.ps GRB011121_B-2 = 072.A-0508B.001.ps, 072.A-0508B.002.ps CAL_LTT4364_R = 072.A-0508B.003.ps, 072.A-0508B.004.ps CAL_LTT4364_B = 072.A-0508B.003.ps, 072.A-0508B.004.ps List of Calibration OBs with Associated Science OBs --------------------------------------------------- Total Number of Submitted Calibration OBs: 0 Phase 2 package Compliance Checks ================================= (Y = Yes, N = No, NA = Not Applicable) Do all your OBs comply with the instrument specific requirements listed on the instrument specific Phase 2 Web pages ? [Y] Do all your Finding Charts comply with the both the general and instrument-specific finding chart requirements? [Y] If you submitted OBs for standard stars, did you specify the magnitude and spectral type of all standard stars ? [Y] Have you included OBs for any calibrations that you need but which are not a part of the Calibration Plan? [NA] [FORS only] Do all your FORS OBs use only the allowed detector read-out modes listed on the FORS1/FORS2 Phase 2 Web pages? [NA] [FORS only] Do all your FORS MOS/LSS OBs contain the mandatory "through-slit image" template? [NA] [UVES only] Do all your UVES OBs use only the allowed templates listed on the UVES Phase 2 Web pages ? [NA] [ISAAC only] Are ALL the objects in your field-of-view fainter than the magnitude limits specified on the ISAAC Phase 2 Web page ? [NA] [ISAAC only] If you submitted OBs for standard stars, did you use the provided ISAAC*_*_cal_* templates? [NA] [FLAMES only] Did you specify the hour angle range for which your Target Setup files are valid ? [NA] [VIMOS only] Did you specify suitable guide stars for all your OBs using Guidecam? [NA] [VIMOS only] Did you check that the chosen guide stars are suitable for all the offset positions and that they do not produce unacceptable vignetting of the field of view? [NA] If you answered "NO" to any of these questions, please revise your OBs *before* submission.