71D3009B.html |
RA Range: 14:21
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 0.9 2CLR 1.4 0.1 60.
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
Deep imaging in V and I. This run should be executed 30+-3 days after run (A) to allow the discovery of high-z supernovae. MOS masks will be, then, prepared as run (C). The total execution time of the 4 OBs is 5h11m, to be completed in two consecutive nights. Acquisition can be skipped if two OBs are executed in a row. Waivers: OBs longer that 1h (degradation allowed after 1h). The programme is completed by run D (imaging to be executed 30+-3 days from run B) and E (follow-up MOS of D).
README of this run: