71D3009A.html |
RA Range: 14:21
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 0.9 2CLR 1.4 0.1 60.
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
Newly submitted OBs for this run: 143038 to 143041 (10.06.2003). Third-epoch pre-imaging to identify high z supernovae. It will be followed by MOS in run E. The terget is visible at the beginning of the night and should be observed with FLI<0.1. Both conditions are met between June 18 and 24. The user, then, ensures super-fast delvery of the MOS OBs for execution in the same dark run (after July 2nd). I-band imaging has higher priority and all 4 OBs should ba completed in two consecutive nights. Waivers: OBs longer that 1h (degradation allowed after 1h).
README of this run: